ASK-EHS Engineering & Consultants Senior Site Engineer Interview Questions and Answers

Updated 2 Dec 2024

ASK-EHS Engineering & Consultants Senior Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Previous company Experience
  • Q2. Salary negotiate

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much your Salary
  • Ans. 

    My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.

    • My salary is determined by factors such as my level of experience in the field.

    • Qualifications and certifications also play a role in determining my salary.

    • Market rates for Civil Site Engineers in the specific location where I work also influence my salary.

    • I am open to discussing salary expectations

  • Answered by AI
  • Q2. When you Join, We need urgent requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - Bakwas
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Site experiance
  • Q2. Calculation site

Interview Preparation Tips

Interview preparation tips for other job seekers - please call hr

Interview Questionnaire 

4 Questions

  • Q1. What was your roles and responsibilities in previous organisation.
  • Ans. 

    In my previous organization, I was responsible for various roles and responsibilities as a Site Engineer Mechanical.

    • Supervised and managed mechanical construction activities on site.

    • Ensured compliance with project specifications and quality standards.

    • Coordinated with contractors, suppliers, and other stakeholders.

    • Performed inspections and tests to ensure proper installation and functioning of mechanical systems.

    • Prepare...

  • Answered by AI
  • Q2. How many man power or team you controlled at a time
  • Ans. 

    I have managed teams of up to 20 individuals in my previous role as a Site Engineer Mechanical.

    • Managed a team of 20 workers on a construction site

    • Coordinated and supervised their tasks to ensure smooth operations

    • Provided guidance and support to team members when needed

    • Ensured adherence to safety protocols and project deadlines

    • Maintained effective communication with team members and other stakeholders

  • Answered by AI
  • Q3. Explain Isometric and P&ID drawing.
  • Ans. 

    Isometric drawing shows a 3D view of piping while P&ID shows the process flow and equipment layout.

    • Isometric drawing is used to represent a 3D view of piping and its components.

    • P&ID drawing shows the process flow and equipment layout in a plant.

    • Isometric drawing is used for fabrication and installation purposes.

    • P&ID drawing is used for design, operation, and maintenance purposes.

    • Isometric drawing shows the dimensions a...

  • Answered by AI
  • Q4. What's your perception about MS.
  • Ans. 

    MS refers to Microsoft, a multinational technology corporation.

    • MS is known for its software products like Windows, Office, and Azure.

    • Microsoft is also involved in hardware production, such as Xbox gaming consoles and Surface devices.

    • The company has a strong presence in the technology industry and is known for its innovation and research.

    • Microsoft has a wide range of services and solutions for businesses and individuals...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your close view prior to interview, what you had done previously. Try to be genuine and straight as much as possible during interview.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. In which firm you have worked before?
  • Ans. 

    I have worked at XYZ Engineering Firm as a Civil Site Engineer.

    • Worked at XYZ Engineering Firm

    • Position: Civil Site Engineer

    • Responsibilities included site inspections, project management, and coordination with contractors

    • Completed projects include construction of a commercial building and a residential complex

  • Answered by AI
  • Q2. What was your job profile ?
  • Ans. 

    As a Civil Site Engineer, my job profile involved overseeing construction projects, managing site operations, and ensuring compliance with safety regulations.

    • Managed and supervised construction projects from start to finish

    • Coordinated with architects, contractors, and subcontractors to ensure smooth project execution

    • Monitored site operations and ensured adherence to project plans and specifications

    • Performed quality con...

  • Answered by AI
  • Q3. How many years of experience you have?
  • Ans. 

    I have 5 years of experience as a Civil Site Engineer.

    • I have worked on various construction projects, including residential, commercial, and infrastructure.

    • During my time as a Civil Site Engineer, I have successfully managed and supervised construction activities.

    • I am well-versed in interpreting engineering drawings and specifications.

    • I have experience in conducting site inspections and ensuring compliance with safety ...

  • Answered by AI
  • Q4. What was your work exactly?
  • Ans. 

    I worked as a Civil Site Engineer, responsible for overseeing construction projects and ensuring their successful completion.

    • Managed and supervised construction activities on site

    • Ensured compliance with building codes and regulations

    • Collaborated with architects, contractors, and other professionals

    • Prepared and reviewed project plans, drawings, and specifications

    • Monitored progress and quality of work

    • Resolved any issues ...

  • Answered by AI
  • Q5. General civil engineering questions like full form of TBM? Types of soil?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and presentable, answer the questions properly. If you are unable to answer some questions then politely tell them sorry sir

ASK-EHS Engineering & Consultants Interview FAQs

How many rounds are there in ASK-EHS Engineering & Consultants Senior Site Engineer interview?
ASK-EHS Engineering & Consultants interview process usually has 1 rounds. The most common rounds in the ASK-EHS Engineering & Consultants interview process are HR.
What are the top questions asked in ASK-EHS Engineering & Consultants Senior Site Engineer interview?

Some of the top questions asked at the ASK-EHS Engineering & Consultants Senior Site Engineer interview -

  1. Previous company Experie...read more
  2. Salary negoti...read more

Tell us how to improve this page.

ASK-EHS Engineering & Consultants Senior Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.9
 • 29 Interviews
Eversendai Interview Questions
3.8
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all
Safety Officer
132 salaries
unlock blur

₹2.5 L/yr - ₹9.7 L/yr

Safety Engineer
18 salaries
unlock blur

₹5.1 L/yr - ₹7.5 L/yr

Safety Manager
14 salaries
unlock blur

₹6.7 L/yr - ₹12.6 L/yr

HR Recruiter
13 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

HR Executive
12 salaries
unlock blur

₹2 L/yr - ₹3.8 L/yr

Explore more salaries
Compare ASK-EHS Engineering & Consultants with

EHS Solutions

4.7
Compare

Envirocare Labs

3.8
Compare

Safety Services Company

4.0
Compare

EHS Consultants

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview