I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About how many types of Transformers you can see in 11kv lines......
  • Q2. What's the meaning of HT line and LT line
  • Ans. 

    HT line stands for High Tension line and LT line stands for Low Tension line in electrical engineering.

    • HT line refers to the transmission line that carries high voltage electricity from the power station to substations or large industrial consumers.

    • LT line refers to the distribution line that carries low voltage electricity from substations to residential and small commercial consumers.

    • HT lines are typically used for l...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident that what you explain about your work process in site....... What u did and learned in dially works at site.......

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
View answer (9)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Wind calculation as per IS code
  • Ans. 

    The procedure for wind calculation as per IS code involves determining the design wind speed, selecting the appropriate terrain category, and calculating the wind pressure.

    • Determine the design wind speed based on the location and height of the structure.

    • Select the appropriate terrain category (rural, urban, etc.) as per IS code guidelines.

    • Calculate the wind pressure using the formula provided in the IS code.

    • Consider fa...

  • Answered by AI
  • Q2. SFD and BMD of cantilever beam
  • Q3. Staad model for fixed pole
  • Ans. 

    A STAAD model for a fixed pole is a structural analysis and design model used to determine the stability and strength of a pole that is fixed in place.

    • In a STAAD model for a fixed pole, the pole is typically modeled as a vertical member with fixed supports at the base.

    • The model considers factors such as wind loads, dead loads, and any other relevant loads that may act on the pole.

    • The analysis helps in determining the s...

  • Answered by AI
  • Q4. Design of Square base plate
  • Ans. 

    Key considerations in designing a square base plate

    • Ensure the base plate is large enough to support the load without excessive deflection

    • Select appropriate material and thickness to meet structural requirements

    • Consider the connection details for attaching the base plate to the structure

    • Account for any potential corrosion or environmental factors that may affect the base plate

    • Include provisions for anchor bolts or other...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare wind calculation & Steel design
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Witch type transformer use in elevator?
  • Q2. Difference in open loop or close loop
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the value of CPK
  • Ans. 

    CPK is a statistical measure used to assess the capability of a process to produce output within specification limits.

    • CPK is calculated using the formula: CPK = (USL - LSL) / (6 * standard deviation)

    • A CPK value greater than 1 indicates that the process is capable of producing within specification limits

    • A CPK value less than 1 indicates that the process may not be capable of consistently producing within specification l

  • Answered by AI
  • Q2. What is Ra in roughnes tester
  • Ans. 

    Ra in roughness tester is the average roughness value of the surface profile within a specified sampling length.

    • Ra is a parameter used to quantify the roughness of a surface.

    • It is calculated as the arithmetic average of the absolute values of the profile heights over the evaluation length.

    • Ra provides a measure of the deviation of the surface profile from the mean line.

    • It is commonly used in industries such as manufactu...

  • Answered by AI
  • Q3. What is 7Qc tool and how you used it in daily routine?
  • Ans. 

    7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.

    • Check sheets: Used to collect and analyze data in a systematic way.

    • Histograms: Used to show frequency distribution of a process.

    • Pareto charts: Helps identify the most significant factors contributing to a problem.

    • Cause-and-effect diagrams: Used to identify and analyze potential causes of a problem.

    • Scatter...

  • Answered by AI
  • Q4. 8D methodology and projects on it
  • Ans. 

    The 8D methodology is a problem-solving approach used in quality management to identify, correct, and prevent recurring problems.

    • The 8D methodology consists of 8 steps: D0 - Plan, D1 - Team Formation, D2 - Problem Description, D3 - Interim Containment Action, D4 - Root Cause Analysis, D5 - Permanent Corrective Action, D6 - Prevent Recurrence, D7 - Recognize Team Effort, D8 - Closure and Team Disbandment

    • It is commonly u...

  • Answered by AI
  • Q5. Previous working related
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions related to core mechanical engg
  • Q2. Product related questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Manufacturing department
  • Q2. Manpower handle
  • Q3. Daily target production

Interview Preparation Tips

Interview preparation tips for other job seekers - I am interested
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How does a CNC machine works?
  • Ans. 

    A CNC machine works by using computer programs to control the movement of the machine's tools and workpiece to create precision parts.

    • CNC machines use computer programs to control the movement of the cutting tools and workpiece.

    • The programs are created using CAD/CAM software and converted into G-code instructions.

    • The machine reads the G-code instructions and moves the tools along the specified paths to cut and shape th...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via campus placement at Sri Vasavi Engineering College, Tadepalligudem

Round 1 - HR 

(2 Questions)

  • Q1. Are you willing to work hard
  • Q2. Are a work in rotational shifts

Interview Preparation Tips

Interview preparation tips for other job seekers - It is completely a production based company

Production Engineer Interview Questions & Answers

Trelleborg user image Yoganandha Janekunte

posted on 26 Sep 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Overall equipment effectiveness
  • Ans. 

    Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.

    • OEE is calculated by multiplying availability, performance, and quality rates.

    • It helps identify areas for improvement in production processes.

    • Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.

  • Answered by AI
  • Q2. Product development
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. What is current
  • Ans. 

    Current is the flow of electric charge in a circuit.

    • Current is measured in Amperes (A).

    • It is the rate of flow of electric charge through a conductor.

    • Current can be either direct current (DC) or alternating current (AC).

  • Answered by AI
  • Q2. What is voltage
  • Ans. 

    Voltage is the difference in electric potential between two points in a circuit, measured in volts.

    • Voltage is the force that pushes electric current through a circuit

    • It is measured in volts (V)

    • Voltage is the potential difference between two points in a circuit

    • Higher voltage means more potential energy available to move electrons

    • Examples: 120V in household outlets, 12V in car batteries

  • Answered by AI

Asian Fab Tec Interview FAQs

How many rounds are there in Asian Fab Tec interview?
Asian Fab Tec interview process usually has 2 rounds. The most common rounds in the Asian Fab Tec interview process are Resume Shortlist and Technical.
What are the top questions asked in Asian Fab Tec interview?

Some of the top questions asked at the Asian Fab Tec interview -

  1. What's the meaning of HT line and LT l...read more
  2. About how many types of Transformers you can see in 11kv lines......read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Asian Fab Tec interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

PMT Machines Interview Questions
3.4
 • 19 Interviews
Trelleborg Interview Questions
4.0
 • 17 Interviews
Escon Elevators Interview Questions
3.4
 • 12 Interviews
Garuda Power Interview Questions
3.4
 • 11 Interviews
D.B ENGINEERING Interview Questions
4.3
 • 11 Interviews
View all

Asian Fab Tec Reviews and Ratings

based on 21 reviews

3.4/5

Rating in categories

3.3

Skill development

3.7

Work-Life balance

3.0

Salary & Benefits

2.8

Job Security

2.8

Company culture

2.8

Promotions/Appraisal

3.3

Work Satisfaction

Explore 21 Reviews and Ratings
Electrical Site Engineer
21 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Site Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Project Coordinator
5 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Purchase Engineer
5 salaries
unlock blur

₹1.5 L/yr - ₹3.5 L/yr

Electrical Site Supervisor
5 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Explore more salaries
Compare Asian Fab Tec with

Escon Elevators

4.0
Compare

Trelleborg

4.0
Compare

Case New-Holland Construction Equipment India

4.1
Compare

MITA

3.5
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview