i
ArcelorMittal Nippon Steel
Filter interviews by
I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.
Oil-filled transformers are better due to higher efficiency and lower maintenance requirements. Test runs should include insulation resistance, turns ratio, and load testing.
Oil-filled transformers are better than dry-type transformers due to higher efficiency and lower maintenance requirements.
Test runs should include insulation resistance testing to check for any insulation breakdown.
Turns ratio testing should be con...
The Blast Furnace is equipped with multiple RIO panels and a variety of DI/DO and AI/AO channels.
The Blast Furnace typically has several RIO panels installed for monitoring and control purposes.
The number of DI/DO channels provided in a Blast Furnace can vary depending on the specific setup and requirements.
During commissioning, major problems may include issues with sensor calibration, communication errors, or softwar...
Top trending discussions
I applied via Naukri.com and was interviewed before Oct 2019. There were 4 interview rounds.
Understanding hydraulic oil NAS value, filtration methods, furnace breakdowns, and VD capacity principles.
NAS value indicates the cleanliness of hydraulic oil, measured by the number of particles per milliliter.
Filtration methods include mechanical filters, magnetic filters, and electrostatic filters to remove contaminants.
Common furnace breakdowns include overheating, fuel supply issues, and refractory failures; solut...
We deal with multiple vendors for spare parts.
We have established relationships with reliable vendors.
We prioritize vendors who offer competitive pricing and quality products.
We regularly evaluate vendor performance to ensure timely delivery and customer satisfaction.
Examples of vendors we deal with include ABC Spare Parts, XYZ Suppliers, and DEF Automotive.
We maintain a database of vendor information, including contac
As a Deputy Manager, I have faced various problems and have developed effective solving techniques.
One problem I faced was a lack of communication between team members. I implemented regular team meetings and encouraged open communication to address this issue.
Another problem was a decline in productivity. I introduced performance tracking systems and provided training and support to improve productivity.
I also encount...
posted on 20 Oct 2023
I applied via Naukri.com and was interviewed before Oct 2022. There were 4 interview rounds.
To plan for equipment reliability, it is important to implement a proactive maintenance strategy.
Develop a preventive maintenance schedule based on manufacturer recommendations
Regularly inspect equipment for signs of wear and tear
Train staff on proper equipment usage and maintenance procedures
Keep detailed records of maintenance activities and equipment performance
Invest in quality equipment and replacement parts
Utiliz...
I applied via LinkedIn and was interviewed in Oct 2022. There were 4 interview rounds.
posted on 1 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Gear box replacement work
Some of the top questions asked at the ArcelorMittal Nippon Steel Senior Manager interview -
based on 1 interview
Interview experience
based on 43 reviews
Rating in categories
Deputy Manager
727
salaries
| ₹4.6 L/yr - ₹16 L/yr |
Assistant Manager
545
salaries
| ₹3 L/yr - ₹11.6 L/yr |
Manager
519
salaries
| ₹6.1 L/yr - ₹22 L/yr |
Assistant Field Engineer
397
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Engineer
345
salaries
| ₹2.4 L/yr - ₹7.5 L/yr |
Tata Steel
JSW Steel
Jindal Steel and Power
Jindal Stainless