Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ArcelorMittal Nippon Steel Team. If you also belong to the team, you can get access from here

ArcelorMittal Nippon Steel Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 2.5k Reviews

Filter interviews by

ArcelorMittal Nippon Steel Deputy Manager Interview Questions, Process, and Tips

Updated 19 Nov 2024

Top ArcelorMittal Nippon Steel Deputy Manager Interview Questions and Answers

View all 9 questions

ArcelorMittal Nippon Steel Deputy Manager Interview Experiences

12 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Plc and profibus communication with how many communication port in a plc controller have etc.
  • Q2. Acs 800 drives,Eot cranes safety interlocks.
Round 2 - One-on-one 

(1 Question)

  • Q1. Acs 800 drives and some carries related questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Barring checking and replacement work

Round 2 - HR 

(5 Questions)

  • Q1. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and motor remove and gearbox remove and gearbox replace and bolts nut tightening sure...
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and new v-scraper replace and bolts nut tightening sure and paper...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and new roller cut marking frem number and new roller replace and Roller s...
  • Q4. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and Barring...
  • Q5. Greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and all Barring checking and savings greasing sure and paper work cancelled and conveyer belt running ok

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sale our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you will check to sanction a loan t ... read more
Q4. What we do for shortage of material received?
Q5. What was your major master areas?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to make pile and what angle
  • Ans. 

    To make a pile, drive the pile into the ground at a specific angle to ensure stability and load-bearing capacity.

    • Choose the appropriate type and size of pile for the specific project requirements.

    • Use a pile driver or hydraulic hammer to drive the pile into the ground at the desired angle.

    • Ensure the pile is driven to the required depth to achieve the necessary load-bearing capacity.

    • Check the alignment and verticality of...

  • Answered by AI
  • Q2. Condition of yard and availability and 15 meter height
  • Ans. 

    The condition of the yard is well-maintained and there is availability of a 15 meter height for storage or construction purposes.

    • The yard is regularly maintained to ensure cleanliness and safety

    • There is ample space for storage or construction activities with a height of 15 meters

    • Proper safety measures are in place to prevent accidents or injuries

    • Regular inspections are conducted to ensure compliance with regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - How to relate your answer for interviewer

Deputy Manager Interview Questions & Answers

user image Rakesh Patra

posted on 27 Oct 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Scaffolding and electrical safety and control.
Round 3 - Technical 

(1 Question)

  • Q1. LOTO and use of LOTO at site.
  • Ans. 

    LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.

    • LOTO is a safety procedure used to prevent accidents during maintenance or servicing of machines.

    • It involves locking the machine in the off position and tagging it to indicate that it should not be operated.

    • Only authorized perso...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. What position is your in your current company?
  • Q2. How much hike you need?
Round 5 - Group Discussion 

One safety topic of your choice.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare technically to clear the interview.

ArcelorMittal Nippon Steel interview questions for designations

 Deputy General Manager

 (1)

 Deputy Manager Operations

 (1)

 Deputy Manager-Electrical

 (1)

 Deputy Manager Mechanical

 (1)

 Deputy Manager II

 (1)

 Deputy Manager - Security

 (1)

 Deputy Manager 1

 (1)

 Deputy General Manager Corporate Affairs

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Procurement Process
  • Q2. Key aspects of Procurement Manager
  • Ans. 

    Key aspects of Procurement Manager include strategic sourcing, supplier relationship management, contract negotiation, and cost reduction.

    • Developing and implementing procurement strategies to optimize costs and quality

    • Managing supplier relationships to ensure timely delivery and quality products/services

    • Negotiating contracts with vendors to secure favorable terms and pricing

    • Identifying cost-saving opportunities through

  • Answered by AI

Get interview-ready with Top ArcelorMittal Nippon Steel Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What was my daily shift work schedule?
  • Q2. Which improvements projects i have done?
  • Q3. What was your cost saving action?
  • Ans. 

    Implemented a new inventory management system resulting in significant cost savings.

    • Implemented a new inventory management system

    • Reduced inventory holding costs by optimizing stock levels

    • Negotiated better pricing with suppliers

    • Identified and eliminated unnecessary expenses

    • Streamlined processes to improve efficiency and reduce costs

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. What is OEE of the machine?
  • Ans. 

    OEE stands for Overall Equipment Efficiency and is a measure of how effectively a machine is utilized in terms of availability, performance, and quality.

    • OEE is a key performance indicator used in manufacturing to assess the productivity and efficiency of a machine.

    • It takes into account three factors: availability, performance, and quality.

    • Availability measures the percentage of time the machine is available for product...

  • Answered by AI
  • Q2. What is HIRA at shopfloor
  • Ans. 

    HIRA at shopfloor stands for Hazard Identification and Risk Assessment.

    • HIRA is a systematic process used to identify potential hazards and assess the associated risks in a shopfloor environment.

    • It involves identifying hazards, evaluating their potential consequences, and determining the likelihood of those consequences occurring.

    • The purpose of HIRA is to prevent accidents, injuries, and damage to property by implementi...

  • Answered by AI
  • Q3. What is IATF and ISO
  • Ans. 

    IATF and ISO are international standards for quality management systems.

    • IATF stands for International Automotive Task Force and is a standard specifically for the automotive industry.

    • ISO stands for International Organization for Standardization and is a generic standard applicable to various industries.

    • Both standards focus on establishing and maintaining effective quality management systems.

    • They provide guidelines and ...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Why you want to join us
  • Q2. How will you be fit for this role

Interview Preparation Tips

Interview preparation tips for other job seekers - Get to know latest technical wordings and give answers confidently.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Behaviour
Round 3 - Technical 

(1 Question)

  • Q1. Work Experience
Round 4 - Technical 

(1 Question)

  • Q1. Senior Management

Deputy Manager Interview Questions & Answers

user image Aviral Bajpai

posted on 29 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Kalinga Institute of Industrial Technology, Khurda and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Same as in every company

Round 2 - Group Discussion 

They have given a topic of infrastructure role on economy

Round 3 - Technical 

(3 Questions)

  • Q1. Iron carbon diagram
  • Ans. 

    Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.

    • Shows the phases of iron and carbon at different temperatures

    • Includes regions for austenite, ferrite, cementite, and pearlite

    • Helps in understanding the microstructure of steel

  • Answered by AI
  • Q2. About training and internship
  • Q3. Pumps and motors

I applied via Referral and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PM Related, PLC AND DRIVE, ISO related, Project related

Interview Preparation Tips

Interview preparation tips for other job seekers - PM Related, ISO RELATED, PROJECT RELATED, PLC SCADA, DRIVES

I applied via Referral and was interviewed in Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Automation related questions
  • Q2. Project management
  • Q3. Shift management

Interview Preparation Tips

Interview preparation tips for other job seekers - For Electrical engineer, knowledge of automation is most important thing.

ArcelorMittal Nippon Steel Interview FAQs

How many rounds are there in ArcelorMittal Nippon Steel Deputy Manager interview?
ArcelorMittal Nippon Steel interview process usually has 2-3 rounds. The most common rounds in the ArcelorMittal Nippon Steel interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in ArcelorMittal Nippon Steel Deputy Manager interview?

Some of the top questions asked at the ArcelorMittal Nippon Steel Deputy Manager interview -

  1. What was your cost saving acti...read more
  2. Condition of yard and availability and 15 meter hei...read more
  3. What is OEE of the machi...read more

Tell us how to improve this page.

ArcelorMittal Nippon Steel Deputy Manager Interview Process

based on 5 interviews in last 1 year

1 Interview rounds

  • Technical Round
View more

People are getting interviews through

based on 10 ArcelorMittal Nippon Steel interviews
Job Portal
Referral
Company Website
Campus Placement
Recruitment Consultant
20%
20%
10%
10%
10%
30% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
ArcelorMittal Nippon Steel Deputy Manager Salary
based on 709 salaries
₹4.5 L/yr - ₹15.5 L/yr
8% more than the average Deputy Manager Salary in India
View more details

ArcelorMittal Nippon Steel Deputy Manager Reviews and Ratings

based on 147 reviews

4.0/5

Rating in categories

3.9

Skill development

3.9

Work-Life balance

3.7

Salary & Benefits

4.1

Job Security

3.7

Company culture

3.5

Promotions/Appraisal

3.6

Work Satisfaction

Explore 147 Reviews and Ratings
Deputy Manager
709 salaries
unlock blur

₹4.5 L/yr - ₹15.5 L/yr

Assistant Manager
576 salaries
unlock blur

₹3 L/yr - ₹11.6 L/yr

Manager
532 salaries
unlock blur

₹7 L/yr - ₹21 L/yr

Assistant Field Engineer
363 salaries
unlock blur

₹1.9 L/yr - ₹5.2 L/yr

Engineer
347 salaries
unlock blur

₹2 L/yr - ₹8.2 L/yr

Explore more salaries
Compare ArcelorMittal Nippon Steel with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Limited

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview