Q1. What was your cost saving action?
Implemented a new inventory management system resulting in significant cost savings.
Implemented a new inventory management system
Reduced inventory holding costs by optimizing stock levels
Negotiated better pricing with suppliers
Identified and eliminated unnecessary expenses
Streamlined processes to improve efficiency and reduce costs
Q2. Condition of yard and availability and 15 meter height
The condition of the yard is well-maintained and there is availability of a 15 meter height for storage or construction purposes.
The yard is regularly maintained to ensure cleanliness and safety
There is ample space for storage or construction activities with a height of 15 meters
Proper safety measures are in place to prevent accidents or injuries
Regular inspections are conducted to ensure compliance with regulations
Q3. What is OEE of the machine?
OEE stands for Overall Equipment Efficiency and is a measure of how effectively a machine is utilized in terms of availability, performance, and quality.
OEE is a key performance indicator used in manufacturing to assess the productivity and efficiency of a machine.
It takes into account three factors: availability, performance, and quality.
Availability measures the percentage of time the machine is available for production.
Performance measures the speed and efficiency of the m...read more
Q4. How to make pile and what angle
To make a pile, drive the pile into the ground at a specific angle to ensure stability and load-bearing capacity.
Choose the appropriate type and size of pile for the specific project requirements.
Use a pile driver or hydraulic hammer to drive the pile into the ground at the desired angle.
Ensure the pile is driven to the required depth to achieve the necessary load-bearing capacity.
Check the alignment and verticality of the pile during installation to prevent any structural is...read more
Q5. What is your expected CTC.
My expected CTC is in line with industry standards and reflects my experience and skills.
Research industry standards for Deputy Manager roles
Consider my years of experience and level of expertise
Factor in the company's budget and compensation structure
Provide a range rather than a specific number
Q6. What is HIRA at shopfloor
HIRA at shopfloor stands for Hazard Identification and Risk Assessment.
HIRA is a systematic process used to identify potential hazards and assess the associated risks in a shopfloor environment.
It involves identifying hazards, evaluating their potential consequences, and determining the likelihood of those consequences occurring.
The purpose of HIRA is to prevent accidents, injuries, and damage to property by implementing appropriate control measures.
Examples of hazards at sho...read more
Q7. What is IATF and ISO
IATF and ISO are international standards for quality management systems.
IATF stands for International Automotive Task Force and is a standard specifically for the automotive industry.
ISO stands for International Organization for Standardization and is a generic standard applicable to various industries.
Both standards focus on establishing and maintaining effective quality management systems.
They provide guidelines and requirements for organizations to ensure consistent qualit...read more
Q8. Key aspects of Procurement Manager
Key aspects of Procurement Manager include strategic sourcing, supplier relationship management, contract negotiation, and cost reduction.
Developing and implementing procurement strategies to optimize costs and quality
Managing supplier relationships to ensure timely delivery and quality products/services
Negotiating contracts with vendors to secure favorable terms and pricing
Identifying cost-saving opportunities through analysis and process improvements
Q9. LOTO and use of LOTO at site.
LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.
LOTO is a safety procedure used to prevent accidents during maintenance or servicing of machines.
It involves locking the machine in the off position and tagging it to indicate that it should not be operated.
Only authorized personnel should perform LOTO procedures.
Training on LOTO proce...read more
Q10. Iron carbon diagram
Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.
Shows the phases of iron and carbon at different temperatures
Includes regions for austenite, ferrite, cementite, and pearlite
Helps in understanding the microstructure of steel