Add office photos
Engaged Employer

ArcelorMittal Nippon Steel

4.1
based on 2.7k Reviews
Filter interviews by

10+ Integrated Freight & Logistics LLC Interview Questions and Answers

Updated 5 Mar 2025
Popular Designations

Q1. If any incidents happen in previous plant after that what you will do for mitigation

Ans.

To mitigate incidents from previous plants, I would analyze, implement safety measures, and train staff effectively.

  • Conduct a thorough incident analysis to identify root causes.

  • Implement corrective actions based on findings, such as upgrading equipment.

  • Enhance safety protocols and standard operating procedures.

  • Provide comprehensive training for staff on new safety measures.

  • Establish a regular review process to monitor safety compliance.

Add your answer

Q2. How to mitigate in any problem come in stacking time

Ans.

Effective strategies to address and reduce stacking time issues in operations.

  • Identify bottlenecks: Analyze the workflow to find where delays occur, such as slow equipment or processes.

  • Implement lean principles: Streamline operations by eliminating waste and optimizing resource use, like reducing unnecessary steps in a process.

  • Enhance communication: Foster clear communication among team members to ensure everyone is aware of their roles and responsibilities, reducing confusio...read more

Add your answer

Q3. What safety components are involved in job execution.

Ans.

Safety components in job execution ensure a secure work environment, minimizing risks and protecting personnel and assets.

  • Personal Protective Equipment (PPE): Helmets, gloves, and goggles to protect workers from physical hazards.

  • Safety Training: Regular training sessions to educate employees on safety protocols and emergency procedures.

  • Risk Assessment: Identifying potential hazards before starting a job to implement necessary precautions.

  • Emergency Procedures: Clear guidelines...read more

Add your answer

Q4. What was your cost saving action?

Ans.

Implemented a new inventory management system resulting in significant cost savings.

  • Implemented a new inventory management system

  • Reduced inventory holding costs by optimizing stock levels

  • Negotiated better pricing with suppliers

  • Identified and eliminated unnecessary expenses

  • Streamlined processes to improve efficiency and reduce costs

View 1 answer
Discover Integrated Freight & Logistics LLC interview dos and don'ts from real experiences

Q5. Condition of yard and availability and 15 meter height

Ans.

The condition of the yard is well-maintained and there is availability of a 15 meter height for storage or construction purposes.

  • The yard is regularly maintained to ensure cleanliness and safety

  • There is ample space for storage or construction activities with a height of 15 meters

  • Proper safety measures are in place to prevent accidents or injuries

  • Regular inspections are conducted to ensure compliance with regulations

View 1 answer

Q6. What is OEE of the machine?

Ans.

OEE stands for Overall Equipment Efficiency and is a measure of how effectively a machine is utilized in terms of availability, performance, and quality.

  • OEE is a key performance indicator used in manufacturing to assess the productivity and efficiency of a machine.

  • It takes into account three factors: availability, performance, and quality.

  • Availability measures the percentage of time the machine is available for production.

  • Performance measures the speed and efficiency of the m...read more

View 1 answer
Are these interview questions helpful?

Q7. How to make pile and what angle

Ans.

To make a pile, drive the pile into the ground at a specific angle to ensure stability and load-bearing capacity.

  • Choose the appropriate type and size of pile for the specific project requirements.

  • Use a pile driver or hydraulic hammer to drive the pile into the ground at the desired angle.

  • Ensure the pile is driven to the required depth to achieve the necessary load-bearing capacity.

  • Check the alignment and verticality of the pile during installation to prevent any structural is...read more

Add your answer

Q8. What is your expected CTC.

Ans.

My expected CTC is in line with industry standards and reflects my experience and skills.

  • Research industry standards for Deputy Manager roles

  • Consider my years of experience and level of expertise

  • Factor in the company's budget and compensation structure

  • Provide a range rather than a specific number

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is HIRA at shopfloor

Ans.

HIRA at shopfloor stands for Hazard Identification and Risk Assessment.

  • HIRA is a systematic process used to identify potential hazards and assess the associated risks in a shopfloor environment.

  • It involves identifying hazards, evaluating their potential consequences, and determining the likelihood of those consequences occurring.

  • The purpose of HIRA is to prevent accidents, injuries, and damage to property by implementing appropriate control measures.

  • Examples of hazards at sho...read more

Add your answer

Q10. What is material pile height

Ans.

Material pile height refers to the vertical measurement of stacked materials, crucial for storage and safety in various industries.

  • Material pile height is essential for optimizing storage space in warehouses.

  • Excessive pile height can lead to safety hazards, such as collapse.

  • For example, in construction, the height of stacked bricks must be regulated.

  • Different materials have different safe pile heights; for instance, loose materials like sand may require lower heights.

Add your answer

Q11. What is IATF and ISO

Ans.

IATF and ISO are international standards for quality management systems.

  • IATF stands for International Automotive Task Force and is a standard specifically for the automotive industry.

  • ISO stands for International Organization for Standardization and is a generic standard applicable to various industries.

  • Both standards focus on establishing and maintaining effective quality management systems.

  • They provide guidelines and requirements for organizations to ensure consistent qualit...read more

Add your answer

Q12. Key aspects of Procurement Manager

Ans.

Key aspects of Procurement Manager include strategic sourcing, supplier relationship management, contract negotiation, and cost reduction.

  • Developing and implementing procurement strategies to optimize costs and quality

  • Managing supplier relationships to ensure timely delivery and quality products/services

  • Negotiating contracts with vendors to secure favorable terms and pricing

  • Identifying cost-saving opportunities through analysis and process improvements

Add your answer

Q13. LOTO and use of LOTO at site.

Ans.

LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.

  • LOTO is a safety procedure used to prevent accidents during maintenance or servicing of machines.

  • It involves locking the machine in the off position and tagging it to indicate that it should not be operated.

  • Only authorized personnel should perform LOTO procedures.

  • Training on LOTO proce...read more

Add your answer

Q14. Iron carbon diagram

Ans.

Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.

  • Shows the phases of iron and carbon at different temperatures

  • Includes regions for austenite, ferrite, cementite, and pearlite

  • Helps in understanding the microstructure of steel

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Integrated Freight & Logistics LLC

based on 14 interviews
3 Interview rounds
Technical Round - 1
HR Round
Technical Round - 2
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Deputy Manager Interview Questions from Similar Companies

4.0
 • 16 Interview Questions
3.7
 • 15 Interview Questions
4.1
 • 14 Interview Questions
4.1
 • 12 Interview Questions
3.7
 • 12 Interview Questions
3.5
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter