i
Filter interviews by
I appeared for an interview in Feb 2025, where I was asked the following questions.
Achieving targets requires strategic planning, effective execution, and continuous monitoring to ensure success.
Set clear, measurable goals: Define specific targets, like increasing sales by 20% in Q2.
Develop a strategic plan: Outline steps to achieve targets, such as identifying key markets and customer segments.
Allocate resources effectively: Ensure the right team and budget are in place to support initiatives.
Monito...
Effective vendor management involves clear communication, relationship building, and performance monitoring to ensure mutual success.
Establish clear expectations: Define deliverables, timelines, and quality standards upfront.
Build strong relationships: Regular check-ins and open communication foster trust and collaboration.
Monitor performance: Use KPIs to assess vendor performance and address issues proactively.
Provide...
Top trending discussions
I applied via Referral
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.
A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.
The system should be designed to handle drums of various sizes and weights
It should include components such as rollers, conveyors, and lifters
The system should be automated to reduce manual labor and increase productivity
Regular maintenance and inspections are necessary to ensure the system is functioning properl
posted on 24 Jun 2024
posted on 28 Feb 2024
I applied via Naukri.com and was interviewed before Feb 2023. There were 4 interview rounds.
Past case study and how you slove it
posted on 20 Sep 2024
Stress vs strain curve of mild steel shows linear elastic region, yield point, ultimate tensile strength, and fracture point.
Mild steel exhibits linear elastic behavior up to the yield point.
After the yield point, plastic deformation occurs until the ultimate tensile strength is reached.
Fracture of mild steel typically occurs after the ultimate tensile strength.
The curve shows the relationship between stress (force app...
posted on 2 Feb 2024
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 13 reviews
Rating in categories
Senior Engineer
4
salaries
| ₹6.1 L/yr - ₹10 L/yr |
Deputy Manager
4
salaries
| ₹8.1 L/yr - ₹13.5 L/yr |
Senior Manager
4
salaries
| ₹19.5 L/yr - ₹25 L/yr |
Section Incharge
4
salaries
| ₹7 L/yr - ₹19 L/yr |
Deputy General Manager
3
salaries
| ₹26 L/yr - ₹48.5 L/yr |
Dhoot Transmission
R.K.M Powergen
SAEL Industries Limited
SHV Energy