I applied via Referral and was interviewed before May 2023. There were 2 interview rounds.
Group Captive Open Access refers to a system where multiple businesses come together to form a captive power plant for their energy needs.
Group Captive Open Access allows businesses to collectively own and operate a power plant to meet their energy requirements.
This system helps businesses reduce their dependence on the grid and potentially lower energy costs.
Businesses participating in Group Captive Open Access must a...
Top trending discussions
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Gear box replacement work
Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok
Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok
Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
I applied via Naukri.com and was interviewed before Mar 2022. There were 6 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.
based on 2 reviews
Rating in categories
Deputy Manager
60
salaries
| ₹7 L/yr - ₹21.2 L/yr |
Assistant Manager
24
salaries
| ₹7 L/yr - ₹18 L/yr |
Senior Manager
9
salaries
| ₹25.2 L/yr - ₹43.3 L/yr |
Manager
8
salaries
| ₹11.3 L/yr - ₹38.5 L/yr |
Senior Engineer
6
salaries
| ₹6 L/yr - ₹9.4 L/yr |
Adani Green Energy
Azure Power
ReNew
Greenko Group