apex construction Civil Site Engineer Interview Questions, Process, and Tips

Updated 27 Aug 2024

Top apex construction Civil Site Engineer Interview Questions and Answers

View all 7 questions

apex construction Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(12 Questions)

  • Q1. Subgrade gsb work
  • Ans. 

    Subgrade GSB work refers to the process of preparing the subgrade by laying Granular Sub Base material.

    • Subgrade GSB work involves laying and compacting Granular Sub Base material to create a stable foundation for the road or structure.

    • The thickness of GSB layer and compaction requirements are specified in the project specifications.

    • Proper compaction is essential to achieve the desired strength and stability of the subg...

  • Answered by AI
  • Q2. Wmm DBM BC
  • Q3. Sad and opustive Measurement
  • Q4. Sab great 2 layers
  • Ans. 

    The question is likely asking about the properties or characteristics of two specific layers in a civil engineering context.

    • Identify the specific layers being referred to in the question

    • Discuss the properties, materials, or functions of each layer

    • Explain any interactions or considerations between the two layers

    • Provide examples of common layer combinations in civil engineering projects

  • Answered by AI
  • Q5. Gsb 2 layer 125 plus 125 mm total 250 mm top player
  • Q6. Wmm 125 plus 125 mm total 250 mm top player
  • Q7. DBM 400 se 500 mm design ke upar hai
  • Q8. BC top layer complete
  • Q9. Welding work upar top Lesnar
  • Q10. Basement Se Lekar ke upar top
  • Q11. Steel level concrete level
  • Q12. Basement Se Lekar 14 second floor

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil engineer highway welding work pipeline work railway line work

I applied via Other and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Minimums thickness of slab
  • Ans. 

    The minimum thickness of a slab depends on various factors such as the load it will bear, the type of material used, and the span of the slab.

    • The minimum thickness of a slab is typically determined by structural engineers based on the design requirements and local building codes.

    • For residential buildings, the minimum thickness of a concrete slab is often around 4 inches (10 cm).

    • For commercial or industrial buildings, t...

  • Answered by AI
  • Q2. What is the size of trade and raise and angle of stairs
  • Ans. 

    The size of trade and rise and angle of stairs vary depending on the specific design and regulations.

    • The size of trade refers to the horizontal distance between two consecutive steps.

    • The rise is the vertical distance between two consecutive steps.

    • The angle of stairs is determined by the ratio of rise to trade.

    • Building codes and regulations provide guidelines for the minimum and maximum values for trade, rise, and angle...

  • Answered by AI
  • Q3. How to calculat weight of steel in feet
  • Ans. 

    The weight of steel in feet can be calculated by multiplying the volume of steel by its density.

    • Calculate the volume of steel by multiplying its length, width, and height

    • Determine the density of the steel material being used

    • Multiply the volume by the density to obtain the weight of steel in pounds

    • Convert the weight from pounds to feet if necessary

  • Answered by AI
  • Q4. In which condition pile foundation will do.
  • Ans. 

    Pile foundations are used in conditions where the soil is weak or unstable to support the structure.

    • Pile foundations are used when the soil is too weak to support the load of the structure.

    • They are also used in areas with expansive soils that can cause excessive settlement.

    • Pile foundations are suitable for sites with high water tables or in coastal areas where the soil is prone to erosion.

    • They are commonly used in area...

  • Answered by AI
  • Q5. In One bag of cement how many cubit feet and cubic meter
  • Ans. 

    One bag of cement is approximately equal to 1.25 cubic feet or 0.035 cubic meters.

    • One bag of cement typically contains 50 kilograms of cement.

    • The volume of one bag of cement is influenced by the density of the cement.

    • To convert cubic feet to cubic meters, divide the value by 35.3147.

    • To convert cubic meters to cubic feet, multiply the value by 35.3147.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly you will ask basic.. If boy have basic knowledge she / he can handle the site of construction

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Fair and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

In general, aptitude tests measure ones competence in logical reasoning, numerical skills, or verbal ability.

Round 2 - Technical 

(5 Questions)

  • Q1. What is the technical in my site ?
  • Q2. What about this company ?
  • Q3. What about my empolys ?
  • Q4. In many cases what will be approch in this technical issus ?
  • Ans. 

    The approach to technical issues in civil engineering often involves analyzing the problem, considering various solutions, and selecting the most feasible option.

    • Identify the technical issue and its impact on the project

    • Analyze the possible solutions and their pros and cons

    • Consider factors such as cost, time, and resources

    • Consult with team members or experts for input

    • Select the most feasible solution and implement it

    • Mo

  • Answered by AI
  • Q5. What is the technical ?

Interview Preparation Tips

Interview preparation tips for other job seekers - i want this job for i will raduse my skill development and i wiil done my job regulry not a skip my company

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is cement grade?
  • Ans. 

    Cement grade refers to the strength and quality of cement used in construction.

    • Cement grade is determined by the compressive strength of cement mortar cubes after 28 days of curing.

    • The most commonly used cement grades are 33, 43, and 53, indicating their respective compressive strengths in megapascals (MPa).

    • Higher cement grades are used for structures that require higher strength, such as bridges and high-rise building...

  • Answered by AI
  • Q2. Opc 33, 43, 53 grads.
  • Q3. The standard size of a concrete cube is 15 cm × 15 cm × 15 cm
  • Ans. 

    Yes, the standard size of a concrete cube is 15 cm × 15 cm × 15 cm.

    • The standard size of a concrete cube is used for testing the compressive strength of concrete.

    • The cubes are casted and cured for 28 days before testing.

    • The cubes are tested using a compression testing machine.

    • The compressive strength of concrete is calculated by dividing the maximum load applied to the cube by the cross-sectional area of the cube.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I had done my Diploma in civil engineering. If you have any vacancy in your reputed organization. Please let me know.

I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the curing on site engineering
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete to promote its hydration and strength gain.

    • Curing is essential for the strength and durability of concrete.

    • It involves keeping the concrete moist and at a proper temperature for a specific period of time.

    • Curing can be done using various methods such as water curing, membrane curing, and steam curing.

    • The duration of curi...

  • Answered by AI
  • Q2. What is the strength of cement
  • Ans. 

    The strength of cement depends on its grade and type.

    • The strength of cement is measured in terms of compressive strength.

    • The grade of cement determines its strength. Higher the grade, higher the strength.

    • Type of cement also affects its strength. For example, Portland cement has higher strength than lime cement.

    • The strength of cement is also influenced by factors such as curing time, temperature, and humidity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I intrest to do a job in your company ,I hope have
a capability to do a job

I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

General knowledge

Round 2 - Technical 

(2 Questions)

  • Q1. About civil engineering
  • Q2. General knowledge Civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - My self Srikant Mallik
I'm studying BTech engeneering
& Complete my diploma
I'm a good student

I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Contraction lebal questions
  • Q2. Jenral questions
  • Q3. Atitude prasnalty

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your homework
Practice (out loud)
Share your story
Provide Evidence and data
Mirror the interviewers style
Prepare a few questions
Ask if they have any hesitation
Say thanks.
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Trouble shooting
  • Q2. Monitoring log dob maven

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Test of sand and water mineral

Round 3 - One-on-one 

(5 Questions)

  • Q1. Direct are located in one place and another place etc..,
  • Q2. Overall base of autocad desgin structure
  • Ans. 

    Autocad design structure serves as the foundation for creating detailed and accurate engineering drawings.

    • Autocad design structure includes layers, blocks, and dimensions to organize and display information.

    • It allows for precise measurements, annotations, and annotations to be added to drawings.

    • Autocad design structure enables easy editing and modification of drawings.

    • Examples of autocad design structures include creat...

  • Answered by AI
  • Q3. Graphic design and interior design
  • Q4. Design of road line
  • Ans. 

    Design of road line involves determining the alignment, width, and markings of a road to ensure safety and efficiency.

    • Consider the traffic volume and speed when determining the width of the road.

    • Ensure proper alignment to minimize sharp curves and slopes.

    • Include appropriate road markings such as lane dividers, pedestrian crossings, and stop lines.

    • Take into account factors like drainage, visibility, and road conditions

  • Answered by AI
  • Q5. Construction of road project
  • Ans. 

    Construction of road project involves planning, design, and execution of building roads for transportation.

    • Road project starts with surveying the land and designing the road layout.

    • Materials like asphalt, concrete, and gravel are used for construction.

    • Proper drainage systems are essential to prevent water damage to the road.

    • Quality control measures are implemented to ensure durability and safety.

    • Regular maintenance and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Autocad design
Web design
Graphic design
Interior design
Pumps desgin

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Oops concepts php
  • Q2. Aggregate function php

apex construction Interview FAQs

How many rounds are there in apex construction Civil Site Engineer interview?
apex construction interview process usually has 1 rounds. The most common rounds in the apex construction interview process are HR.
What are the top questions asked in apex construction Civil Site Engineer interview?

Some of the top questions asked at the apex construction Civil Site Engineer interview -

  1. What is the size of trade and raise and angle of sta...read more
  2. In One bag of cement how many cubit feet and cubic me...read more
  3. In which condition pile foundation will d...read more

Tell us how to improve this page.

apex construction Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
apex construction Civil Site Engineer Salary
based on 5 salaries
₹2 L/yr - ₹4.5 L/yr
28% less than the average Civil Site Engineer Salary in India
View more details

apex construction Civil Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Safety Officer
5 salaries
unlock blur

₹1.8 L/yr - ₹2.4 L/yr

Project Engineer
4 salaries
unlock blur

₹3.6 L/yr - ₹4.8 L/yr

Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹2.5 L/yr

Project Incharge
4 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Explore more salaries
Compare apex construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview