Using a soil compactor on GSB & WMM layers with a deadload of 12 tons or above can lead to excessive compaction and potential damage to the layers.
Excessive compaction can result in reduced permeability of the layers, affecting drainage.
The excessive force from the compactor can cause cracking or deformation in the layers.
It may also lead to uneven settlement and structural instability in the pavement.
Proper evaluation...
SMA layer is used in high speed expressways for its superior durability, rut resistance, and fatigue resistance.
SMA (Stone Matrix Asphalt) layer provides superior durability compared to traditional asphalt mixes.
SMA layer has excellent rut resistance, maintaining a smooth surface for high speed traffic.
The high binder content in SMA enhances fatigue resistance, reducing cracking and extending pavement life.
SMA mixtures...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
posted on 31 Jan 2024
About site experience
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
141
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Senior Engineer
136
salaries
| ₹4.2 L/yr - ₹11.4 L/yr |
Site Engineer
96
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
82
salaries
| ₹7 L/yr - ₹18 L/yr |
Store Officer
76
salaries
| ₹2.2 L/yr - ₹5.8 L/yr |
AECOM
L&T Energy Hydrocarbon
Saipem
Aarvee Associates