Top trending discussions
posted on 26 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.
Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.
Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.
For example, a higher temperature mix may require more diesel to heat th...
I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.
Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year
Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction
Led cross-functional projects to streamline operations and reduce costs by 10%
posted on 20 Dec 2024
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
Unit weight of steel is typically around 7850 kg/m^3.
Unit weight of steel is commonly expressed in kg/m^3.
The unit weight of steel can vary depending on the type of steel being used.
For example, the unit weight of mild steel is approximately 7850 kg/m^3.
Shuttering level can be checked using a spirit level to ensure it is horizontal or vertical.
Use a spirit level to check if the shuttering is horizontal or vertical
Ensure the bubble in the spirit level is centered to indicate level
Adjust the shuttering as needed to achieve the correct level
Check multiple points along the shuttering to ensure consistency
posted on 28 Nov 2024
I applied via Company Website and was interviewed before Nov 2023. There was 1 interview round.
The temperature needed for BC laying is typically around 70-75 degrees Fahrenheit.
The ideal temperature for BC laying is between 70-75 degrees Fahrenheit
Maintaining a consistent temperature is important for successful BC laying
Extreme temperatures can negatively impact the BC laying process
P&M Quality objectives focus on improving product and manufacturing quality standards.
Implementing quality control measures to ensure products meet specifications
Continuous monitoring and analysis of production processes for quality improvement
Training employees on quality standards and best practices
Setting specific quality targets to achieve measurable improvements
Regularly reviewing and updating quality objectives b...
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
posted on 28 Apr 2022
Yes, I have dealt with fatal accidents in my previous role as HR Manager.
I have provided support to employees and their families during such incidents
I have worked with management to ensure proper communication and support is provided to affected employees
I have also reviewed and updated safety protocols to prevent future incidents
For example, in one instance, an employee passed away due to a workplace accident and I w...
Factory acts are laws that regulate the working conditions in factories.
Factory acts are designed to protect the health and safety of workers.
They typically cover issues such as working hours, breaks, and safety equipment.
Examples of factory acts include the Factory Act of 1833 in the UK and the Occupational Safety and Health Act in the US.
posted on 12 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Sep 2018. There were 5 interview rounds.
Civil Site Engineer
13
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Civil Engineer
12
salaries
| ₹2.7 L/yr - ₹4.6 L/yr |
Safety Officer
9
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Accountant
6
salaries
| ₹2.1 L/yr - ₹3 L/yr |
Senior Civil Engineer
5
salaries
| ₹3.2 L/yr - ₹6 L/yr |
CTS Consulting & Technical Support
Patel Infrastructure
J K Fenner
Saudi Binladin Group