I applied via Indeed and was interviewed in Apr 2023. There were 3 interview rounds.
Auto cad drafting for substation
A water cooled chilled water system circulates water through a chiller to cool it and then distributes it to air handling units.
Water is circulated through a chiller to cool it down
The cooled water is then distributed to air handling units
Heat is absorbed from the air by the chilled water
The warm water is then returned to the chiller to be cooled again
A cooling tower is used to dissipate the heat absorbed by the water
P...
Piping materials depend on the application and fluid being transported.
Common materials include copper, steel, PVC, and PEX.
For high-temperature applications, stainless steel or titanium may be used.
For corrosive fluids, materials such as PVC or fiberglass may be used.
Material selection also depends on factors such as pressure, flow rate, and cost.
Regarding previous jobs
Heat load calculation
I was interviewed before May 2016.
I was interviewed in Jul 2017.
I was interviewed in Jul 2017.
Yes, I am a fresher with no past working experience.
I am a recent graduate looking to gain experience in the field.
I have completed internships or projects during my studies.
I am eager to learn and grow in a professional environment.
I was responsible for conducting market research, creating social media content, and assisting with event planning.
Conducted market research to identify trends and opportunities
Created engaging social media content to increase brand awareness
Assisted in planning and executing events to promote company products/services
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
Experience with programming languages such as Java, Python, and C++
I applied via Approached by Company and was interviewed in Jul 2017. There were 5 interview rounds.
I applied via Other and was interviewed in Jan 2018. There were 5 interview rounds.
I applied via Other and was interviewed in Jan 2018. There were 5 interview rounds.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
based on 5 interviews
Interview experience
based on 23 reviews
Rating in categories
Project Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Hvac Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Hvac Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning