Auto cad drafting for substation
A water cooled chilled water system circulates water through a chiller to cool it and then distributes it to air handling units.
Water is circulated through a chiller to cool it down
The cooled water is then distributed to air handling units
Heat is absorbed from the air by the chilled water
The warm water is then returned to the chiller to be cooled again
A cooling tower is used to dissipate the heat absorbed by the water
P...
Piping materials depend on the application and fluid being transported.
Common materials include copper, steel, PVC, and PEX.
For high-temperature applications, stainless steel or titanium may be used.
For corrosive fluids, materials such as PVC or fiberglass may be used.
Material selection also depends on factors such as pressure, flow rate, and cost.
posted on 21 May 2021
I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.
Hvac Site Engineer
7
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Senior Design Engineer
6
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Hvac Engineer
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Engineer
5
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Design Engineer
4
salaries
| ₹5 L/yr - ₹8 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Exotic Learning