I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
Nickel plating is a process of electroplating a layer of nickel onto a metal surface to enhance its appearance, corrosion resistance, and durability.
Nickel plating involves immersing the metal object in a solution containing nickel ions and applying an electric current to deposit a layer of nickel onto the surface.
It is commonly used to protect metal objects from corrosion and wear, as well as to improve their aestheti...
Cadmium plating is a process of electroplating a thin layer of cadmium onto a metal surface to provide corrosion resistance and improve lubricity.
Cadmium plating is commonly used in aerospace and military applications.
It is known for its excellent corrosion resistance, especially in saltwater environments.
Cadmium plating also offers good lubricity, making it suitable for moving parts.
The process involves immersing the ...
I applied via Approached by Company and was interviewed in Oct 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Amphenol Interconnect interview questions for popular designations
I applied via Walk-in and was interviewed in Sep 2021. There were 2 interview rounds.
Yes, I am familiar with the tables of mathematics.
I am proficient in multiplication tables up to 12.
I can quickly calculate basic math problems using multiplication tables.
For example, 7 x 8 = 56.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2020. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
Kaizen is a Japanese term for continuous improvement and 7QC tools are quality control techniques used to identify and solve problems.
Kaizen involves making small, incremental improvements to processes and systems to increase efficiency and reduce waste.
7QC tools include Pareto charts, cause-and-effect diagrams, flowcharts, histograms, scatter diagrams, control charts, and check sheets.
These tools are used to analyze d...
8D analysis, Six Sigma, and SPC are quality control methodologies used in production engineering.
8D analysis is an eight-step problem-solving methodology used to identify, correct, and prevent recurring problems.
Six Sigma is a data-driven approach to quality control that aims to reduce defects and improve processes.
SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operat...
OEE is a metric used to measure manufacturing productivity. 5 types of wastes are defects, overproduction, waiting, non-utilized talent, and transportation.
OEE stands for Overall Equipment Effectiveness and is a measure of how effectively a manufacturing operation is utilized
It is calculated by multiplying availability, performance, and quality
The 5 types of wastes are defects, overproduction, waiting, non-utilized tal...
The duration of Amphenol Interconnect interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 3 interviews
Interview experience
based on 688 reviews
Rating in categories
Quality Engineer
162
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Engineer
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
85
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Controller
84
salaries
| ₹0 L/yr - ₹0 L/yr |
TE Connectivity
Molex
Delphi Automotive Systems
Jabil