I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
Prefer to work in urban areas with easy access to public transportation and amenities.
Prefer urban areas over rural areas
Look for locations with good public transportation options
Consider proximity to amenities such as restaurants, shops, and gyms
RA bill process involves verification of work done, measurement, calculation of quantities, and certification for payment.
Verification of work done by site inspection
Measurement of completed work using drawings and specifications
Calculation of quantities based on approved rates
Certification of bill for payment by client or consultant
Rate analysis of waterproofing involves calculating the cost of materials, labor, and equipment needed for waterproofing work.
Calculate the quantity of materials required for waterproofing (e.g. membrane, sealant, primer)
Determine the cost of materials per unit (e.g. cost per square meter of membrane)
Estimate the labor cost based on the time required for waterproofing work
Include the cost of equipment rental or purchas...
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 22 Feb 2022
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
posted on 22 Jan 2025
I appeared for an interview in Dec 2024.
Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of its successor activity.
Total Float is calculated by subtracting Early Start (ES) from Late Start (LS) or Early Finish (EF) from Late Finish (LF).
Free Float is calculated by subtracting Early Start (ES) of the succ...
Earned Value Analysis (EVA) is a project management technique used to measure project performance and progress by comparing planned work with actual work completed.
EVA integrates scope, schedule, and cost to provide a comprehensive view of project performance.
Key EVA metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC).
EVA helps in forecasting project outcomes, identifying variances, and making d...
Key aspects to consider in delay analysis include identifying causes, assessing impact, analyzing critical path, and determining responsibility.
Identifying the causes of delays, such as design changes, weather conditions, or resource constraints
Assessing the impact of delays on the project timeline and budget
Analyzing the critical path to determine which activities are most critical to the project schedule
Determining r...
I would rate my proficiency in P6/MSP as an 8 out of 10.
I have extensive experience using P6/MSP in previous projects.
I have successfully created and managed complex schedules using P6/MSP.
I have received positive feedback on my proficiency in P6/MSP from colleagues and supervisors.
Different types of contracts include fixed-price, cost-reimbursable, time and materials, and unit price contracts.
Fixed-price contracts: Price is agreed upon upfront and does not change regardless of actual costs incurred.
Cost-reimbursable contracts: Contractor is reimbursed for all allowable costs incurred, plus a fee.
Time and materials contracts: Payment is based on actual hours worked and materials used, with a pre-...
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 25 Jan 2025
Role of engineer to control disaster management
posted on 12 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 4 interview rounds.
Demonetization, pros and cons, 5 people in the discussion. HR were friendly and make possible way to comfort the candidates.
Aptitude and technical question-mostly difficult questions.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
45
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
27
salaries
| ₹3.6 L/yr - ₹9.6 L/yr |
Executive Engineer
17
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Deputy Engineer
17
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Safety Officer
15
salaries
| ₹3 L/yr - ₹5 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai