The unit weight of reinforcement bar can be found by calculating the weight per unit length.
The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.
The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.
The length of the bar is measured in meters or feet, depending on the unit system used.
The density of the mat...
Unit weights of building materials are important for quantity surveying.
Unit weight of concrete is around 2400 kg/m³
Unit weight of brick is around 1920 kg/m³
Unit weight of steel is around 7850 kg/m³
Unit weight of timber is around 500 kg/m³
Unit weight of glass is around 2500 kg/m³
Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.
It is important to measure and track productivity to identify areas for improvement.
Factors that can affect productivity include training, equipment, and work environment.
Productivity can be improved through better planning, organization, and communication.
Examples of productivity measures include output per worker, t...
The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.
Review the contract to ensure all work completed is billable
Prepare an invoice detailing the work completed and the corresponding costs
Submit the invoice to the client for payment within the agreed upon timeframe
Follow up with the client to ensure payment is received on time
Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.
Calculate the total length of bars required for each size and type
Determine the number of bars required for each size and type
Calculate the shape and bending details of each bar
Prepare a detailed schedule of all the bars required for the structure
Ensure compliance with design and con
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.
Implemented INDAS 115 to recognize revenue from contracts with customers
Applied INDAS 116 to account for leases in financial statements
Ensured compliance with INDAS standards in financial reporting
Prepared financial statements following the guidelines of INDAS
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
Assistant Manager
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
GMR Group
Reliance Infrastructure