Filter interviews by
I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.
Open to working every 2nd Saturday for the Senior IT Manager position.
I am open to working every 2nd Saturday as required for the role.
Flexibility in scheduling is important in a managerial position.
Prior experience working on weekends can be beneficial.
Consider discussing any potential compensation or time-off arrangements.
Yes, I am always interested in upgrading my IT skills to stay current with the latest technologies and trends.
Regularly attend workshops, seminars, and online courses to learn new skills
Obtain certifications in relevant IT areas such as cloud computing or cybersecurity
Participate in hackathons or coding challenges to practice and improve coding skills
Top trending discussions
posted on 2 Dec 2024
The golden rule of accounting states that debit what comes in and credit what goes out.
Debit what comes in and credit what goes out
Helps maintain the balance in accounting records
Used to ensure accuracy in financial transactions
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
One meter is equal to 39.37 inches.
One meter is equivalent to 100 centimeters.
One inch is equal to 2.54 centimeters.
To convert meters to inches, multiply by 39.37 (100 * 2.54).
Steel density is typically around 7.85 g/cm^3.
Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary depending on the specific alloy composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.
I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
I applied via Referral
posted on 2 Sep 2023
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Associate
203
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Software Engineer
183
salaries
| ₹3.6 L/yr - ₹11.6 L/yr |
Senior Associate
136
salaries
| ₹2 L/yr - ₹5.3 L/yr |
Senior Analyst
126
salaries
| ₹2.5 L/yr - ₹9.3 L/yr |
Senior Software Engineer
100
salaries
| ₹6 L/yr - ₹18.1 L/yr |
Cognizant
Genpact
Wipro
TCS