Filter interviews by
About survey questions
A horizontal curve is a curve on a road or railway track that allows vehicles or trains to smoothly transition from a straight path to a curved path.
Horizontal curves are used to improve safety and comfort for drivers or passengers by reducing the sharpness of turns.
They are typically found on highways, roads, and railways where the terrain requires a change in direction.
Horizontal curves are designed with specific rad...
Vertical curve is a curve on a road or railway where the gradient changes gradually to ensure smooth transition between different grades.
Vertical curve is used in civil engineering to provide a smooth transition between different grades on a road or railway.
It helps in ensuring safety and comfort for drivers or passengers by reducing sudden changes in slope.
The curve is typically parabolic in shape, with the lowest poi...
The maximum superelevation is typically limited to 12% on highways.
Maximum superelevation is usually limited to 12% on highways.
Superelevation is the banking of a road or railway track around a curve to counteract the effects of centrifugal force.
Exceeding the maximum superelevation can lead to safety hazards for vehicles.
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2020. There were 6 interview rounds.
posted on 14 Dec 2019
I applied via Recruitment Consultant
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
To control deviation in vertically elements, proper leveling techniques and equipment must be used.
Use a precise leveling instrument such as a digital level or an automatic level
Ensure the instrument is properly calibrated before use
Establish a benchmark or reference point for vertical control
Use a leveling rod or staff to measure height differences accurately
Perform regular checks and adjustments during the survey to ...
Cross checking column position in land surveying
Cross check column position by comparing measurements from different surveying techniques
Use multiple surveying instruments to verify column positions
Compare measurements with existing reference points or benchmarks
Ensure accuracy by repeating measurements and averaging the results
Document and record all measurements and cross-checking steps for future reference
To control plastering thickness, proper preparation, use of guides, and regular measurements are essential.
Ensure the surface is clean and free from debris before applying plaster.
Use guides such as screeds or battens to maintain a consistent thickness.
Regularly measure the thickness using a measuring tape or a thickness gauge.
Adjust the amount of plaster applied based on the measurements to achieve the desired thickne...
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
The principle of surveying involves measuring and mapping the Earth's surface to determine the relative positions of points.
Surveying is used to establish property boundaries, create topographic maps, and plan construction projects.
The principle of surveying relies on accurate measurements using various instruments such as total stations, GPS receivers, and levels.
Surveyors use mathematical calculations and trigonometr...
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
posted on 4 Aug 2024
Structure complete at the time taken as built coordinate
Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.
Start by reviewing property deeds and legal documents to understand boundaries
Use surveying equipment like total stations or GPS to measure and mark boundaries accurately
Consider any existing structures or obstacles on the site that may affect the survey layout
Setting out coordinate involves establishing points on the ground based on a specific coordinate system.
Use surveying equipment like total stations or GPS to accurately measure and mark points
Ensure the coordinate system used is consistent and accurate
Verify the points set out match the design or plan specifications
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Team Manager
25
salaries
| ₹10 L/yr - ₹20 L/yr |
Maintenance Technician
24
salaries
| ₹4 L/yr - ₹13 L/yr |
Senior Team Manager
15
salaries
| ₹15 L/yr - ₹31 L/yr |
Automation Engineer
13
salaries
| ₹12 L/yr - ₹15 L/yr |
Team Lead
13
salaries
| ₹8 L/yr - ₹18 L/yr |
Cargill
Mother Dairy Fruit & Vegetable
Mondelez International
Perfetti Van Melle