Upload Button Icon Add office photos

Filter interviews by

AL NASR CONTRACTING Interview Questions and Answers

Updated 26 Apr 2023

AL NASR CONTRACTING Interview Experiences

Popular Designations

3 interviews found

I applied via Company Website and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. REVIT MEP AND REGARDING BIM QUESTION
  • Q2. BIM QUESTION (REVIT TOOLS)
Round 3 - Assignment 

REVIT ASSIGNMENT (ALL SERVICES MODELING AND COORDINATION)

Round 4 - HR 

(1 Question)

  • Q1. REGARDING CTC ALLOVER

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Chandan C Nirmal Currently working as an mep revit coordination (2d+revit coordination+naviswork) with al nasr contracting company llc. U.A.E from more than last 6 years.
i have over all 12+ years experience as mep revit coordination.

Revit BIM Modeler Interview Questions asked at other Companies

Q1. How to create a level ? 2. How to create a grid ? 3. How to draw a wall?
View answer (2)

Electrical Project Engineer Interview Questions & Answers

user image Srinivasan Rathinamoorthy PMP

posted on 26 Apr 2023

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Related to projects
  • Q2. Project experience,design knowledge,
  • Q3. Procurement knowledge
  • Q4. Planning skills

Electrical Project Engineer Interview Questions asked at other Companies

Q1. What is important factors in cable calculation? Types of communication used in Automation industry & its length limitations, What is difference between Analog input 4-20mA & analog input (0-10v). Dg synch control panel & it's wo... read more
View answer (1)

I applied via LinkedIn and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is basics of Planning how to load resources all questions will be regarding Cost resources and budgeting. Also how to track & monitor the project how and when to raise a red flag.

Interview Preparation Tips

Topics to prepare for AL NASR CONTRACTING Planning Engineer interview:
  • Project Planning
  • Planning
  • Project Management
Interview preparation tips for other job seekers - They will ask you how to load Resources into P6 they will make you do in PC and how is the WBS broken down how to filter Resources how to use the Critical path and raise a red flag also how the program is taken back to track in a logical way. Also be prepares to expect questions in a practical way not the books exact working experience & skills will be checked.

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Do you have any experience working in data center
  • Ans. 

    Yes, I have 5 years of experience working in data centers.

    • Managed server hardware installations and upgrades

    • Performed routine maintenance tasks such as cabling and rack mounting

    • Troubleshooted network and server issues

    • Implemented disaster recovery plans

    • Monitored and optimized data center performance

  • Answered by AI
  • Q2. What’s component inside of server
  • Ans. 

    Components inside a server include CPU, RAM, hard drives, power supply, motherboard, and network interface cards.

    • CPU (Central Processing Unit) - processes instructions and performs calculations

    • RAM (Random Access Memory) - stores data and instructions that the CPU needs

    • Hard drives - store data and programs long-term

    • Power supply - provides electricity to the server components

    • Motherboard - connects all the components toge...

  • Answered by AI
  • Q3. What’s should you do before turn off server?
  • Ans. 

    Before turning off a server, it is important to properly shut down all running applications and services to prevent data loss or corruption.

    • Save any work in progress and close all applications

    • Ensure all services are stopped gracefully

    • Check for any pending updates or patches

    • Backup important data if necessary

    • Notify users or stakeholders about the planned shutdown

    • Document the shutdown process for future reference

  • Answered by AI
  • Q4. Tell me different type of optical cables
  • Ans. 

    Different types of optical cables include single-mode fiber, multi-mode fiber, and plastic optical fiber.

    • Single-mode fiber: used for long-distance communication, has a small core size and transmits infrared laser light.

    • Multi-mode fiber: used for shorter distances, has a larger core size and transmits infrared LED light.

    • Plastic optical fiber: used for short-distance applications like home networks, made of plastic inste

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Process of troubleshooting network issue
  • Ans. 

    Troubleshooting network issues involves identifying the problem, gathering information, isolating the cause, and implementing a solution.

    • Identify the problem by gathering information from users and monitoring tools

    • Isolate the cause by checking network configurations, hardware, and software

    • Implement a solution by making necessary changes and testing the network

    • Document the troubleshooting process for future reference

  • Answered by AI
  • Q2. What tools do you use to check optical fiber
  • Ans. 

    I use tools like optical power meters, visual fault locators, and OTDRs to check optical fiber.

    • Optical power meters measure the power level of the optical signal.

    • Visual fault locators help identify breaks or bends in the fiber.

    • OTDRs (Optical Time Domain Reflectometers) analyze the quality of the fiber by sending pulses of light and measuring reflections.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare for interview

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical aptitude test
  • Q2. Technical about job knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to hv core subject knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the Standard Methods of measurement Used in the construction Industry?
  • Ans. 

    Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

    • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

    • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

    • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...

  • Answered by AI
  • Q2. What types of software are used for quantity stack-off and estimation in construction?
  • Ans. 

    Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

    • Bluebeam

    • Planswift

    • CostX

  • Answered by AI
  • Q3. What is the NRM? Use of NRM1, 2 and 3
  • Ans. 

    NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

    • NRM1 is used for the preparation of bills of quantities in construction projects.

    • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...

  • Answered by AI
  • Q4. What is the Value Engineering?
  • Ans. 

    Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.

    • Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.

    • It focuses on improving the value of a project by optimizing its functions, quality, and cost.

    • Value Engineering often involves brainstorming sessions with a team of experts to...

  • Answered by AI
  • Q5. What is the main Role of the Quantity Surveyor in Pre-Contact and Post-Contract Stages?
  • Ans. 

    Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.

    • Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.

    • Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.

    • Quantity Surveyors also provide advice on contractual m...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is the Salary Expectation based on your Qualifications and Experience?
  • Ans. 

    Salary expectation is based on qualifications, experience, industry standards, and location.

    • Consider industry standards for Civil Quantity Surveyors and Site Engineers

    • Take into account your level of experience and qualifications

    • Factor in the location of the job as cost of living varies

    • Research average salaries for similar positions in your area

    • Be prepared to negotiate based on benefits and perks offered

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family background
  • Q2. Current working
Round 2 - One-on-one 

(2 Questions)

  • Q1. Family details about family
  • Q2. Qualification, working profile, job profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How early u join Notice period
  • Ans. 

    I am able to join with a notice period of 1 month.

    • I can join with a notice period of 1 month

    • I am flexible with my notice period

    • I can discuss and negotiate the notice period if needed

  • Answered by AI
  • Q2. What is u r salary expectations and negotiating
  • Ans. 

    I am open to discussing a competitive salary based on the responsibilities and expectations of the role.

    • Express willingness to negotiate based on job requirements

    • Research industry standards and company budget before giving a range

    • Consider benefits, bonuses, and other perks in addition to base salary

    • Avoid giving a specific number unless pressed, focus on overall compensation package

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If this is the last company exist in the world and no option left then only join
VP, President,DGM, and Mangers of the company thinks they have hired robots not human,

*robots who are available 24X7*

VP and President both gender biased they always listens who does ye sir yes sir and “sir aap ko pata hai kya?” like peoples
Worst management
HR takes exist interview with every candidate but implements nothing
Have wasted my talent and time working with this company very bad experience
Grow up BCCL we are in independent country people are working with you are
colleagues not bondslave
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is sport colour?
  • Ans. 

    Sport colour refers to the specific color used to identify different teams or players in sports.

    • Sport colour helps differentiate between teams or players during a game or competition

    • It is often used on uniforms, equipment, or accessories

    • Examples include the green jerseys of the Boston Celtics in basketball or the yellow jerseys of the Tour de France leader in cycling

  • Answered by AI
  • Q2. What is Pantone
  • Ans. 

    Pantone is a standardized color matching system used in various industries, particularly in printing and design.

    • Pantone provides a universal language for communicating colors accurately.

    • Each color in the Pantone system is assigned a unique code, making it easy to replicate colors across different materials and processes.

    • Designers and printers use Pantone swatch books to select and match colors for consistent results.

    • Pa...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aptara Indesign Operator interview:
  • Typography
  • color theory
Interview preparation tips for other job seekers - C.V. shortlist, Introduction, skill test, technical questions,
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Ans. 

    LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.

    • LEL is used to determine the potential for a fire or explosion in a confined space.

    • Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.

    • If the LEL of a gas is exceeded, it indicates a potentially hazard...

  • Answered by AI
  • Q2. Tel us the control of confind
  • Ans. 

    Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.

    • Implementing a permit-to-work system to control access to confined spaces

    • Conducting thorough risk assessments before entry

    • Providing appropriate training for workers on confined space entry procedures

    • Using gas detectors and ventilation systems to monitor and control atmospheric conditions

    • Having a rescue plan

  • Answered by AI

AL NASR CONTRACTING Interview FAQs

How many rounds are there in AL NASR CONTRACTING interview?
AL NASR CONTRACTING interview process usually has 2-3 rounds. The most common rounds in the AL NASR CONTRACTING interview process are Resume Shortlist, Technical and Assignment.
What are the top questions asked in AL NASR CONTRACTING interview?

Some of the top questions asked at the AL NASR CONTRACTING interview -

  1. What is basics of Planning how to load resources all questions will be regardin...read more
  2. REVIT MEP AND REGARDING BIM QUEST...read more
  3. BIM QUESTION (REVIT TOO...read more

Tell us how to improve this page.

People are getting interviews through

based on 3 AL NASR CONTRACTING interviews
Company Website
Job Portal
67%
33%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

AL NASR CONTRACTING Reviews and Ratings

based on 16 reviews

4.2/5

Rating in categories

4.4

Skill development

4.0

Work-Life balance

4.2

Salary & Benefits

3.7

Job Security

4.0

Company culture

3.3

Promotions/Appraisal

4.0

Work Satisfaction

Explore 16 Reviews and Ratings
Mechanical Engineer
5 salaries
unlock blur

₹14 L/yr - ₹15 L/yr

Site Engineer
4 salaries
unlock blur

₹12 L/yr - ₹13.1 L/yr

HSE Engineer
3 salaries
unlock blur

₹18 L/yr - ₹34.7 L/yr

Senior Planning Engineer
3 salaries
unlock blur

₹28 L/yr - ₹46 L/yr

HSE Advisor
3 salaries
unlock blur

₹8.6 L/yr - ₹25 L/yr

Explore more salaries
Compare AL NASR CONTRACTING with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

Tata Projects

4.3
Compare

Punj Lloyd

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview