Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
posted on 23 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.
Identify and eliminate unnecessary expenses
Increase sales through marketing strategies or expanding product offerings
Streamline operations to reduce waste and improve efficiency
posted on 13 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the...
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint f...
L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.
L/6 is used for residential buildings while L/3 is used for commercial buildings.
The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.
For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...
I applied via Company Website and was interviewed before Sep 2021. There were 4 interview rounds.
I have a strong profile and extensive experience in project management.
Over 10 years of experience in leading and delivering successful projects
Proven track record of managing large cross-functional teams
Expertise in budgeting, resource allocation, and risk management
Strong communication and stakeholder management skills
Experience in various industries including technology, construction, and healthcare
Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.
Designing and testing electrical systems and equipment
Developing and implementing electrical projects
Troubleshooting and repairing electrical issues
Collaborating with other engineers and professionals
Examples: designing power grids, developing renewable energy sources, creating electronic devices
posted on 27 Aug 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
Cost control in construction activities through effective management of major items
Develop a detailed cost estimate for the project
Monitor and track actual costs against the estimate
Identify major cost drivers and implement cost-saving measures
Regularly review and update the project budget
Ensure effective communication and collaboration between all stakeholders
Use technology and software to streamline cost control proc...
posted on 9 Nov 2021
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
based on 1 review
Rating in categories
Civil Site Engineer
3
salaries
| ₹1 L/yr - ₹18 L/yr |
Electrical Estimation Engineer
3
salaries
| ₹5 L/yr - ₹6.1 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures