Upload Button Icon Add office photos

Filter interviews by

Al Adrak Trading and Contracting Interview Questions and Answers for Experienced

Updated 3 Oct 2023

Al Adrak Trading and Contracting Interview Experiences for Experienced

Popular Designations

1 interview found

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How many years experience in same line

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview was normal .they ask me about plant operations and computer knowledge .

Batching Plant Operator Interview Questions asked at other Companies

Q1. What problem, facing in plant operation, mechanical and electrical?
View answer (3)

Jobs at Al Adrak Trading and Contracting

View all

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Business Ideas

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare properly for Interviews

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

1 Question

  • Q1. Technical question

I appeared for an interview in Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. They asked me about RAM and ROM

Interview Preparation Tips

Round: Technical Interview
Experience: I studied about them before so it was not a problem for me

Skills: Coding Skills
College Name: IIT Kharagpur

I appeared for an interview before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Questions on C++

Interview Preparation Tips

Round: Resume Shortlist
Experience: Only those with Java, C++ and JavaScript were shortlisted.

Round: Test
Experience: Pretty basic
Duration: 3 hours

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basics related to piperack design
  • Q2. Design parameters for steel structure
  • Ans. 

    Design parameters for steel structure

    • Load capacity and distribution

    • Material strength and durability

    • Environmental factors such as wind and seismic activity

    • Connection details and joint design

    • Fire resistance and protection measures

  • Answered by AI
  • Q3. Number of years exposure to staad
  • Ans. 

    I have 5 years of exposure to STAAD software.

    • I have used STAAD for various structural analysis and design projects.

    • I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.

    • I have experience in using STAAD for seismic analysis and design of structures.

    • I have also used STAAD for foundation design and analysis.

    • I keep myself updated with the latest versions and features of STAAD so

  • Answered by AI
  • Q4. Grating design and deflection limits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive & confident

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

Al Adrak Trading and Contracting Interview FAQs

How many rounds are there in Al Adrak Trading and Contracting interview for experienced candidates?
Al Adrak Trading and Contracting interview process for experienced candidates usually has 3 rounds. The most common rounds in the Al Adrak Trading and Contracting interview process for experienced candidates are Resume Shortlist, HR and Technical.
How to prepare for Al Adrak Trading and Contracting interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Al Adrak Trading and Contracting. The most common topics and skills that interviewers at Al Adrak Trading and Contracting expect are Hotel Management, Bartending, Facility Management, Guest House Management and Hotel.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 765 Interviews
AECOM Interview Questions
4.2
 • 120 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Saipem Interview Questions
4.1
 • 47 Interviews
Galfar Interview Questions
4.1
 • 27 Interviews
View all

Al Adrak Trading and Contracting Reviews and Ratings

based on 62 reviews

3.3/5

Rating in categories

3.4

Skill development

3.0

Work-life balance

2.6

Salary

3.3

Job security

3.0

Company culture

2.6

Promotions

3.0

Work satisfaction

Explore 62 Reviews and Ratings
NET Developer For OMAN

Oman

6-8 Yrs

₹ 10-12 LPA

Explore more jobs
Project Engineer
9 salaries
unlock blur

₹4 L/yr - ₹12 L/yr

HSE Officer
8 salaries
unlock blur

₹5.5 L/yr - ₹9.5 L/yr

Quantity Surveyor
7 salaries
unlock blur

₹1 L/yr - ₹3.7 L/yr

Site Engineer
7 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Site Supervisor
5 salaries
unlock blur

₹0.4 L/yr - ₹6 L/yr

Explore more salaries
Compare Al Adrak Trading and Contracting with

L&T Construction

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview