Upload Button Icon Add office photos

Filter interviews by

Ahluwalia Contracts India Billing Engineer Interview Questions, Process, and Tips

Updated 31 Jul 2024

Top Ahluwalia Contracts India Billing Engineer Interview Questions and Answers

View all 6 questions

Ahluwalia Contracts India Billing Engineer Interview Experiences

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the labour charges for main item like concrete, Shuttering & Rainforcement steel?
  • Ans. 

    The labor charges for main items like concrete, shuttering, and reinforcement steel vary depending on factors such as location, project size, and labor rates.

    • The labor charges for concrete are typically calculated based on the volume of concrete required and the prevailing labor rates.

    • The labor charges for shuttering (formwork) are usually determined based on the area of formwork required and the complexity of the desi...

  • Answered by AI
  • Q2. What is rolling margin?
  • Ans. 

    Rolling margin is a financial metric that measures the profitability of a company's operations over a specific period of time.

    • Rolling margin is calculated by dividing the operating profit by the net sales and expressing it as a percentage.

    • It helps in evaluating the efficiency and profitability of a company's core business activities.

    • A higher rolling margin indicates better profitability and operational efficiency.

    • For e...

  • Answered by AI
  • Q3. What is the allowable Wastage percentage of major item?
  • Ans. 

    The allowable wastage percentage of a major item varies depending on the industry and project specifications.

    • The allowable wastage percentage is typically specified in the project contract or specifications.

    • It is important to minimize wastage to control costs and ensure efficient resource utilization.

    • The allowable wastage percentage may differ for different major items, such as concrete, steel, or electrical materials.

    • ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Shuttering quantity calculation
  • Ans. 

    Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.

    • Calculate the surface area of the structure that needs formwork

    • Determine the type of formwork material to be used

    • Consider the complexity of the structure and any special requirements

    • Account for wastage and extra material for safety

    • Use standard formulas or software for accurate calculations

  • Answered by AI
  • Q2. Concrete quantity calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Go to interview with full preparation.

Billing Engineer Interview Questions Asked at Other Companies

Q1. What is Escalation and what is the significance of this? What is ... read more
Q2. What is the difference between penality and Liquidity damages?
Q3. How many types of contract and their importance? What are the adv ... read more
Q4. What do you understand by Term Basic Price variation?
Q5. Wastage litim of rainforcement steel as per cpwd and market pract ... read more

Billing Engineer Interview Questions & Answers

user image Sagnik Sen Sarma

posted on 17 Mar 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Extra items and substitute items
  • Q2. Earth cutting as per cpwd norms
  • Ans. 

    Earth cutting as per CPWD norms involves following specific guidelines for excavation work.

    • CPWD norms specify the depth and width of excavation for different types of soil

    • The guidelines also include safety measures to be followed during earth cutting

    • Proper disposal of excavated material is also a key aspect of CPWD norms

  • Answered by AI
  • Q3. All kinds of deduction done in measurements
  • Ans. 

    Deductions in measurements include shrinkage, wastage, breakage, and spillage.

    • Shrinkage: Reduction in size or weight of materials during handling or storage.

    • Wastage: Loss of materials during the construction process.

    • Breakage: Damage to materials during transportation or handling.

    • Spillage: Accidental loss of materials due to spills or leaks.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Previous experience
  • Q2. Previous qualification

Ahluwalia Contracts India interview questions for designations

 Billing Manager

 (2)

 Site Engineer

 (2)

 Planning Engineer

 (1)

 Senior Planning Engineer

 (2)

 Civil Site Engineer

 (1)

 Junior Engineer Civil

 (1)

 Fabrication Engineer

 (1)

 Senior Safety Officer

 (3)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Introduced ur self
  • Q2. Covers of structure different type of element
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Client billing , QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About budgeting
  • Q2. About rate analysis
Round 3 - Technical 

(2 Questions)

  • Q1. About scheduling
  • Q2. About budgeting
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Site Engineer 

(5 Questions)

  • Q1. Building construction site
  • Q2. Civil engineering building construction
  • Q3. Building constructions road
  • Q4. Sayan Choudhury
  • Q5. Civil work surveying🛣️

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site & Billing Engineer interview:
  • Capital Goods
  • Civil Engineering
  • Site Engineering
  • Building Construction
  • Commercial Buildings
Interview preparation tips for other job seekers - Civil engineering

Site Engineer , civil work, Building construction,
site supervisors experience metro project Bumbai Root project Engineer consultancy private limited Company experience building construction site Engineer metro project, site supervisor , and leveling Survey Topic - BS, IS, FS, RL, HI, BM, TBM , value with rise and fall method
Survey
Instruments Name- Auto Leveling
interdisciplinary knowledge.learn practical application of theoretical knowledge on any subject and enables a deep learning experience.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding of subcontractor Billing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question related to QS
Round 2 - HR 

(1 Question)

  • Q1. Previous Company and Salary Discussion

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Senior Billing Engineer interview:
  • Basic Civil

Ahluwalia Contracts India Interview FAQs

How many rounds are there in Ahluwalia Contracts India Billing Engineer interview?
Ahluwalia Contracts India interview process usually has 1 rounds. The most common rounds in the Ahluwalia Contracts India interview process are Technical and HR.
How to prepare for Ahluwalia Contracts India Billing Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ahluwalia Contracts India. The most common topics and skills that interviewers at Ahluwalia Contracts India expect are Billing Engineering, Medical Billing, Billing, Boq Preparation and Estimation Engineering.
What are the top questions asked in Ahluwalia Contracts India Billing Engineer interview?

Some of the top questions asked at the Ahluwalia Contracts India Billing Engineer interview -

  1. What is the labour charges for main item like concrete, Shuttering & Rainforcem...read more
  2. What is the allowable Wastage percentage of major it...read more
  3. All kinds of deduction done in measureme...read more

Tell us how to improve this page.

Ahluwalia Contracts India Billing Engineer Interview Process

based on 4 interviews

1 Interview rounds

  • Technical Round
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
View all
Ahluwalia Contracts India Billing Engineer Salary
based on 57 salaries
₹2.5 L/yr - ₹9 L/yr
25% more than the average Billing Engineer Salary in India
View more details

Ahluwalia Contracts India Billing Engineer Reviews and Ratings

based on 17 reviews

4.0/5

Rating in categories

3.8

Skill development

3.3

Work-life balance

3.3

Salary

3.2

Job security

3.4

Company culture

3.4

Promotions

3.4

Work satisfaction

Explore 17 Reviews and Ratings
Senior Engineer
114 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Civil Engineer
110 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Site Engineer
93 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Civil Site Engineer
81 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Engineer
69 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Ahluwalia Contracts India with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview