I applied via Campus Placement and was interviewed in Dec 2023. There were 2 interview rounds.
Concrete ratio for M10, M15, and M25 grades.
M10 concrete has a ratio of 1:3:6 (cement:sand:aggregate)
M15 concrete has a ratio of 1:2:4 (cement:sand:aggregate)
M25 concrete has a ratio of 1:1:2 (cement:sand:aggregate)
If labour does not do work, I will take the following steps to address the situation.
Identify the reason for their lack of work, such as lack of motivation or inadequate training.
Communicate with the labour to understand their concerns and address any issues they may have.
Reassign tasks to other available labour or hire additional labour if necessary.
Implement a performance monitoring system to track the productivity o...
To manage the quantity of cement bags on site, it is important to accurately estimate the required amount and monitor the consumption. Ordering should be done in advance to avoid delays.
Estimate the quantity of cement bags required for the project based on the construction plans and specifications.
Monitor the consumption of cement bags on site by keeping track of the number used and the progress of the project.
Regularl...
The density of steel is around 7.85 g/cm³ and the density of cement is around 3.15 g/cm³.
The density of steel is higher than that of cement.
Density is a measure of how much mass is contained in a given volume.
Steel is a commonly used construction material due to its high strength and durability.
Cement is a binding agent used in construction to hold materials together.
The density of steel can vary depending on its compo...
M in M25 stands for Mix design of concrete. The strength of 25 refers to the characteristic compressive strength of concrete in megapascals (MPa) after 28 days.
M25 is a mix design of concrete commonly used in construction.
The number 25 represents the characteristic compressive strength of concrete after 28 days.
The strength of 25 MPa is achieved by using the appropriate proportions of cement, aggregates, and water in t...
Top trending discussions
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Very easy
I applied via Walk-in and was interviewed before May 2019. There were 5 interview rounds.
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Site Engineer
4
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Management Trainee
3
salaries
| ₹4.5 L/yr - ₹7 L/yr |
TCS
Accenture
Wipro
Cognizant