Filter interviews by
Top trending discussions
posted on 5 Sep 2021
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
To control shop floor workmen absenteeism, implement a combination of preventive measures, effective communication, and fair policies.
Implement a comprehensive attendance tracking system
Establish clear attendance policies and communicate them to all employees
Encourage a positive work environment and foster employee engagement
Provide incentives for good attendance and recognize employees with low absenteeism
Address unde...
I come from a close-knit family of five, including my parents, my older sister, and my younger brother.
My parents have always been supportive of my career choices.
My sister is a doctor and my brother is studying engineering.
We enjoy spending quality time together on weekends, whether it's going for a hike or watching movies at home.
5S is a methodology for organizing a workplace, especially a shared workplace, to improve efficiency and effectiveness by eliminating waste.
Sort - separate needed tools, parts, and instructions from unneeded materials
Set in order - neatly arrange and identify parts and tools for ease of use
Shine - clean and inspect work area and equipment regularly
Standardize - establish schedules and methods for maintaining the workpl...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves all employees in the maintenance process
Focuses on preventing breakdowns and improving overall equipment efficiency
Includes activities such as cleaning, inspection, lubrication, and training of operators
Example: Implementing TPM can lead to reduced downtime and increased productivi
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 3 interview rounds.
Costing of sheet metal and aluminium involves various factors such as material cost, labor cost, tooling cost, and overhead cost.
Material cost is the cost of raw material used in manufacturing the product.
Labor cost includes the cost of wages, benefits, and other expenses related to the workforce.
Tooling cost includes the cost of tools and equipment used in the manufacturing process.
Overhead cost includes the cost of u...
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
Quality of materials and products is ensured through various methods.
Establishing quality standards and procedures
Conducting regular inspections and tests
Collaborating with suppliers to ensure quality materials
Implementing corrective actions when necessary
Continuous improvement through data analysis and feedback
Training employees on quality control measures
I investigate production flaws by analyzing data, conducting root cause analysis, and implementing corrective actions.
Collect and analyze data on the production process
Conduct root cause analysis to identify the source of the flaw
Develop and implement corrective actions to prevent future flaws
Collaborate with production team to ensure corrective actions are effective
Document findings and actions taken for future refere
Implemented quality control procedures in a project for improving product reliability.
Identified critical areas for quality control and developed a plan
Conducted regular inspections and audits to ensure compliance
Implemented statistical process control to monitor and improve product quality
Collaborated with cross-functional teams to address quality issues and implement corrective actions
Trained employees on quality con
based on 5 reviews
Rating in categories
Engineer
208
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Assistant Engineer
187
salaries
| ₹1.4 L/yr - ₹5 L/yr |
Senior Engineer
148
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Assistant Manager
105
salaries
| ₹4.5 L/yr - ₹10.4 L/yr |
Production Engineer
103
salaries
| ₹2.4 L/yr - ₹5 L/yr |
ZF Steering Gear
Toyoda Gosei Minda
Global Autotech
Mikuni