i
African Industries
Filter interviews by
I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.
Passion for managing civil projects
Proven track record of successful project completions
Excited about the opportunity to contribute to impactful infrastructure projects
I requested a salary hike due to increased responsibilities, achievements, and market value.
Increased responsibilities in current role
Achievements such as successful completion of projects or exceeding targets
Market value based on industry standards and experience
Cost of living increase or inflation affecting expenses
The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.
Site preparation involves clearing the area and leveling the ground for construction.
Excavation is the process of digging a hole in the ground to create space for the foundation.
Foundation design is crucial to ensure the building's stability and load-be...
The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.
Design mix is determined based on the required strength and durability of the concrete
It involves selecting the right proportions of cement, sand, aggregates, and water
Various factors like type of construction, exposure conditions, and desired workability influence...
The maximum thickness of slab bar is typically around 32mm to 40mm.
The maximum thickness of slab bar is determined by the design requirements and load capacity of the structure.
In general, the maximum thickness of slab bar is around 32mm to 40mm.
Thicker slab bars may be used for heavy-duty structures or special design requirements.
M25 grade concrete ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)
M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively
This means for every part of cement, there is an equal part of sand and double the part of aggregate
For example, for 1 cubic meter of M25 grade concrete, you would need 1 cubic meter of cement, 1 cubic meter of sand, and 2 cubic meters of aggregate
The maximum diameter of a dowel bar typically ranges from 1 inch to 2 inches.
Typical maximum diameter of dowel bar is 1 inch to 2 inches
Dowel bars are commonly used in concrete pavement joints
The diameter of dowel bars can vary based on the specific project requirements
1 M3 of cement volume is equivalent to 1440 kg or 1.44 tonnes.
1 M3 of cement volume is equal to 1440 kg or 1.44 tonnes.
This volume is commonly used in construction projects to calculate the amount of cement needed.
It is important to accurately measure and calculate cement volume to ensure the structural integrity of the project.
posted on 6 Sep 2022
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Assistant Manager
39
salaries
| ₹7 L/yr - ₹22 L/yr |
Manager
27
salaries
| ₹14.4 L/yr - ₹31 L/yr |
Deputy Manager
22
salaries
| ₹9 L/yr - ₹24.2 L/yr |
Production Manager
12
salaries
| ₹12 L/yr - ₹30 L/yr |
Electrical Engineer
11
salaries
| ₹8.4 L/yr - ₹18 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra