Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by African Industries Team. If you also belong to the team, you can get access from here

African Industries Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 361 Reviews

Filter interviews by

African Industries Project Manager Civil Interview Questions and Answers

Updated 19 Dec 2024

African Industries Project Manager Civil Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why you are applying for this job?
  • Ans. 

    I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.

    • Passion for managing civil projects

    • Proven track record of successful project completions

    • Excited about the opportunity to contribute to impactful infrastructure projects

  • Answered by AI
  • Q2. Why you requested for salary hike?
  • Ans. 

    I requested a salary hike due to increased responsibilities, achievements, and market value.

    • Increased responsibilities in current role

    • Achievements such as successful completion of projects or exceeding targets

    • Market value based on industry standards and experience

    • Cost of living increase or inflation affecting expenses

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Explain about the various stages of construction of the foundation of building.
  • Ans. 

    The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.

    • Site preparation involves clearing the area and leveling the ground for construction.

    • Excavation is the process of digging a hole in the ground to create space for the foundation.

    • Foundation design is crucial to ensure the building's stability and load-be...

  • Answered by AI
  • Q2. What will be the Design mix for Concrete .
  • Ans. 

    The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.

    • Design mix is determined based on the required strength and durability of the concrete

    • It involves selecting the right proportions of cement, sand, aggregates, and water

    • Various factors like type of construction, exposure conditions, and desired workability influence...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is a maximum thickness of slab bar
  • Ans. 

    The maximum thickness of slab bar is typically around 32mm to 40mm.

    • The maximum thickness of slab bar is determined by the design requirements and load capacity of the structure.

    • In general, the maximum thickness of slab bar is around 32mm to 40mm.

    • Thicker slab bars may be used for heavy-duty structures or special design requirements.

  • Answered by AI
  • Q2. What is M25 grade concrete ratio
  • Ans. 

    M25 grade concrete ratio is 1:1:2 (1 part cement, 1 part sand, 2 parts aggregate)

    • M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M25 grade concrete, you would need 1 cubic meter of cement, 1 cubic meter of sand, and 2 cubic meters of aggregate

  • Answered by AI
  • Q3. What is maximam diameter of dowel bar ?
  • Ans. 

    The maximum diameter of a dowel bar typically ranges from 1 inch to 2 inches.

    • Typical maximum diameter of dowel bar is 1 inch to 2 inches

    • Dowel bars are commonly used in concrete pavement joints

    • The diameter of dowel bars can vary based on the specific project requirements

  • Answered by AI
  • Q4. What is 1 M3 of cement volume?
  • Ans. 

    1 M3 of cement volume is equivalent to 1440 kg or 1.44 tonnes.

    • 1 M3 of cement volume is equal to 1440 kg or 1.44 tonnes.

    • This volume is commonly used in construction projects to calculate the amount of cement needed.

    • It is important to accurately measure and calculate cement volume to ensure the structural integrity of the project.

  • Answered by AI

I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Building materials, estimating & casting
  • Q2. Reinforced cement concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindalco is great place to work and most sustainable production metal company

African Industries Interview FAQs

How many rounds are there in African Industries Project Manager Civil interview?
African Industries interview process usually has 2 rounds. The most common rounds in the African Industries interview process are HR and Technical.
How to prepare for African Industries Project Manager Civil interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at African Industries. The most common topics and skills that interviewers at African Industries expect are Civil Project Management, CRM, Estimation, Execution and Industrial Construction.
What are the top questions asked in African Industries Project Manager Civil interview?

Some of the top questions asked at the African Industries Project Manager Civil interview -

  1. Explain about the various stages of construction of the foundation of buildi...read more
  2. What will be the Design mix for Concret...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Group Interview Questions
3.9
 • 175 Interviews
JSW Group Interview Questions
4.0
 • 105 Interviews
Bharat Forge Interview Questions
3.8
 • 54 Interviews
View all

African Industries Project Manager Civil Reviews and Ratings

based on 3 reviews

4.8/5

Rating in categories

3.5

Skill development

4.4

Work-Life balance

4.4

Salary & Benefits

4.0

Job Security

3.7

Company culture

4.3

Promotions/Appraisal

3.5

Work Satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
39 salaries
unlock blur

₹7 L/yr - ₹22 L/yr

Manager
27 salaries
unlock blur

₹14.4 L/yr - ₹31 L/yr

Deputy Manager
22 salaries
unlock blur

₹9 L/yr - ₹24.2 L/yr

Production Manager
12 salaries
unlock blur

₹12 L/yr - ₹30 L/yr

Electrical Engineer
11 salaries
unlock blur

₹8.4 L/yr - ₹18 L/yr

Explore more salaries
Compare African Industries with

Tata Group

4.2
Compare

Reliance Industries

4.1
Compare

Aditya Birla Group

4.1
Compare

Mahindra & Mahindra

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview