Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Surveyor Interview Questions and Answers for Freshers

Updated 1 Jun 2024

Afcons Infrastructure Surveyor Interview Experiences for Freshers

1 interview found

Surveyor Interview Questions & Answers

user image Anonymous

posted on 31 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Very arjent work going every time
  • Q2. Site co-ordinate problem
  • Ans. 

    Site coordinate problems can arise due to incorrect measurements, outdated maps, or human error.

    • Ensure all measurements are accurate and up-to-date

    • Use GPS technology for precise location data

    • Double check all calculations and coordinates before proceeding

    • Consult with other surveyors or experts if unsure

    • Example: If a building is constructed in the wrong location due to incorrect coordinates, it can lead to legal disputes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Every time

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Total station error distribution in GPS to GPS
  • Ans. 

    Total station errors can affect GPS to GPS measurements due to various factors.

    • Total station errors can include instrument calibration errors, atmospheric conditions, and human error.

    • Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.

    • Regular calibration and maintenance of the total station can

  • Answered by AI
  • Q2. Coordinates kaise nikalte hai CAD se
  • Q3. Auto level arre distribution
Round 3 - HR 

(2 Questions)

  • Q1. Selery discussion
  • Q2. Which company working

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company working

Afcons Infrastructure Interview FAQs

How many rounds are there in Afcons Infrastructure Surveyor interview for freshers?
Afcons Infrastructure interview process for freshers usually has 1 rounds. The most common rounds in the Afcons Infrastructure interview process for freshers are One-on-one Round.
What are the top questions asked in Afcons Infrastructure Surveyor interview for freshers?

Some of the top questions asked at the Afcons Infrastructure Surveyor interview for freshers -

  1. Site co-ordinate prob...read more
  2. Why is important of Survey Working style and their featur...read more
  3. How will be Understand the Construction equipmen...read more

Tell us how to improve this page.

Afcons Infrastructure Surveyor Interview Process for Freshers

based on 1 interview

Interview experience

5
  
Excellent
View more
Afcons Infrastructure Surveyor Salary
based on 33 salaries
₹2.5 L/yr - ₹7.5 L/yr
At par with the average Surveyor Salary in India
View more details

Afcons Infrastructure Surveyor Reviews and Ratings

based on 10 reviews

4.5/5

Rating in categories

4.3

Skill development

4.0

Work-life balance

4.0

Salary

3.7

Job security

4.1

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 10 Reviews and Ratings
Senior Engineer
486 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Planning Engineer
196 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
187 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Engineer
172 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
153 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview