Transmission line survey involves assessing the route and terrain for the installation of power transmission lines.
Conduct a preliminary survey to identify potential routes and assess environmental impact
Perform a detailed survey to determine the exact location of the transmission line and any necessary adjustments
Consider factors such as terrain, vegetation, and existing infrastructure
Ensure compliance with local regu...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 10 Nov 2021
based on 1 review
Rating in categories
Project Engineer
5
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Electrical Engineer
5
salaries
| ₹2.5 L/yr - ₹2.8 L/yr |
Cost Accountant
4
salaries
| ₹15 L/yr - ₹27 L/yr |
Business Development Manager
4
salaries
| ₹4 L/yr - ₹17.6 L/yr |
Site Engineer
4
salaries
| ₹2.2 L/yr - ₹4 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd