AEC Inc. Project Coordinator Interview Questions and Answers

Updated 27 Jan 2024

AEC Inc. Project Coordinator Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. What project management tool have you used for construction projects?
  • Ans. 

    I have used Primavera P6 for project management in construction projects.

    • Primavera P6 is a widely used project management tool in the construction industry.

    • It helps in planning, scheduling, and controlling construction projects.

    • It allows for resource management, cost tracking, and progress monitoring.

    • With Primavera P6, I have successfully managed multiple construction projects, ensuring timely completion and adherence ...

  • Answered by AI
  • Q2. Tell me about a time where you had to deal with vendors and clients. How did you manage resources to meet their expectations?

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Distribution buisness working process
  • Q2. Billing process
  • Q3. CTC process
  • Q4. Planning scope
Round 2 - HR 

(2 Questions)

  • Q1. Last salary withdrawal
  • Q2. Certificate details

Interview Preparation Tips

Interview preparation tips for other job seekers - Having same job experience makes 70 percent yes, having little reference makes 100%

Interview Questionnaire 

2 Questions

  • Q1. About my past projects
  • Q2. About myself and family

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General project management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest

Interview Questionnaire 

1 Question

  • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

Interview Preparation Tips

Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently

Interview Questionnaire 

2 Questions

  • Q1. Causes of accident
  • Ans. 

    Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

    • Human error: Mistakes or negligence by individuals involved in the project.

    • Equipment failure: Malfunction or breakdown of machinery or tools.

    • Environmental conditions: Adverse weather, natural disasters, or other external factors.

    • Lack of safety measures: Insufficient safety protocols o...

  • Answered by AI
  • Q2. 1. Unsufficient maintenance of machinery.
  • Ans. 

    Insufficient maintenance of machinery can lead to breakdowns and production delays.

    • Regular maintenance schedules should be established and followed.

    • Proper training should be provided to operators and maintenance personnel.

    • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

    • Examples: oil changes, lubrication, cleaning, calibration, inspections.

    • Failure to maintain...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident only

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake
    Interview experience
    5
    Excellent
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - One-on-one 

    (2 Questions)

    • Q1. Self introduction
    • Q2. Experience in the concern field
    Round 2 - HR 

    (2 Questions)

    • Q1. They will ask about your previous experience
    • Q2. Will ask about previous salary

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Good company
    Interview experience
    5
    Excellent
    Difficulty level
    Easy
    Process Duration
    2-4 weeks
    Result
    Selected Selected

    I appeared for an interview in Aug 2024.

    Round 1 - HR 

    (1 Question)

    • Q1. Prepare project plan in consultation with Project manager and planner and tracking the project 2. Participate in daily reviews and documentation (MOM and highlighting
    Round 2 - Group Discussion 

    NPD Design review document preparation

    Round 3 - HR 

    (1 Question)

    • Q1. Handling logistics between plants and suppliers based on need

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Preparation of BOM and SOB
    Interview experience
    3
    Average
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Monster and was interviewed before Apr 2023. There were 2 interview rounds.

    Round 1 - Case Study 

    Experience details gathered from last projects was shared.

    Round 2 - HR 

    (1 Question)

    • Q1. Was asked about compensation details

    Interview Preparation Tips

    Interview preparation tips for other job seekers - concentrate on your abilities and communicate the same. Should be confident about the technical questions being put forward.

    AEC Inc. Interview FAQs

    How many rounds are there in AEC Inc. Project Coordinator interview?
    AEC Inc. interview process usually has 1 rounds. The most common rounds in the AEC Inc. interview process are HR.

    Tell us how to improve this page.

    AEC Inc. Project Coordinator Interview Process

    based on 1 interview

    Interview experience

    4
      
    Good
    View more

    Interview Questions from Similar Companies

    L&T Construction Interview Questions
    4.0
     • 746 Interviews
    Tata Projects Interview Questions
    4.2
     • 435 Interviews
    GMR Group Interview Questions
    4.0
     • 80 Interviews
    GAMMON INDIA Interview Questions
    3.8
     • 29 Interviews
    Essar Group Interview Questions
    3.7
     • 28 Interviews
    Punj Lloyd Interview Questions
    4.3
     • 18 Interviews
    View all
    Project Engineer
    5 salaries
    unlock blur

    ₹1.8 L/yr - ₹4.3 L/yr

    Electrical Engineer
    5 salaries
    unlock blur

    ₹2.5 L/yr - ₹2.8 L/yr

    Cost Accountant
    4 salaries
    unlock blur

    ₹15 L/yr - ₹27 L/yr

    Business Development Manager
    4 salaries
    unlock blur

    ₹4 L/yr - ₹17.6 L/yr

    Site Engineer
    4 salaries
    unlock blur

    ₹2.2 L/yr - ₹4 L/yr

    Explore more salaries
    Compare AEC Inc. with

    L&T Construction

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Shapoorji Pallonji Group

    4.1
    Compare

    Punj Lloyd

    4.3
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview