I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2022. There were 2 interview rounds.
The gear box functions to transfer power from the engine to the wheels, allowing the vehicle to change speed and direction.
Transfers power from the engine to the wheels
Allows the vehicle to change speed and direction
Consists of gears that mesh together to provide different gear ratios
I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.
The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.
Cement is made by heating limestone, clay, and other materials in a kiln
The chemical reaction between cement and water, known as hydration, results in the hardening of concrete
The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used
Calculate deflection at free end of cantilever beam with point load at end
Use the formula: δ = (PL³)/(3EI)
P is the point load at the end
L is the length of the cantilever beam
E is the modulus of elasticity of the beam material
I is the moment of inertia of the beam's cross-sectional area
Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm
Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.
Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.
It is achieved by raising the center of the road surface.
The amount of camber depends on the width of the road and the expected rainfall.
The steps for the construction of a road include surveying, cle...
Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.
Admixtures are added to concrete to improve its quality and performance.
They can affect the setting time, workability, strength, and durability of concrete.
Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.
Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.
Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.
In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...
Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.
Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.
No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...
Project management is the process of planning, organizing, and overseeing the completion of a project.
Involves setting goals, defining tasks, allocating resources, and monitoring progress
Requires effective communication, problem-solving, and decision-making skills
Examples include creating a timeline, assigning roles, and tracking milestones
I applied via Referral and was interviewed in Oct 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
Project Engineer
5
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Electrical Engineer
5
salaries
| ₹2.5 L/yr - ₹2.8 L/yr |
Cost Accountant
4
salaries
| ₹15 L/yr - ₹27 L/yr |
Business Development Manager
4
salaries
| ₹4 L/yr - ₹17.6 L/yr |
Site Engineer
4
salaries
| ₹2.2 L/yr - ₹4 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd