I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.
Regulations ECE and FMVSS and Design standards for Sheetmetal and plastic
ECE regulations are standards set by the United Nations Economic Commission for Europe for the safety and environmental performance of vehicles.
FMVSS refers to Federal Motor Vehicle Safety Standards, which are regulations set by the National Highway Traffic Safety Administration in the United States.
Design standards for sheet metal and plastic inv...
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
CAD TEST, Plastic, Metal, Assembly
Top trending discussions
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
posted on 10 Apr 2024
based on 29 reviews
Rating in categories
Design Engineer
257
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Senior Design Engineer
217
salaries
| ₹5 L/yr - ₹11.2 L/yr |
Product Engineer
186
salaries
| ₹7.3 L/yr - ₹16.5 L/yr |
CAE Engineer
53
salaries
| ₹6 L/yr - ₹11.5 L/yr |
Assistant Engineering Manager
48
salaries
| ₹11.5 L/yr - ₹21.5 L/yr |
Faurecia
Lear Corporation
Magna International
Bharat Forge