Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
The 5 core tools refer to a set of quality control tools used in manufacturing and production processes.
1. Process Flow Diagrams
2. Control Charts
3. Pareto Charts
4. Histograms
5. Scatter Diagrams
Improving quality involves implementing processes to ensure products or services meet or exceed customer expectations.
Implement quality control measures to identify and address defects early on
Provide training and resources to employees to ensure they understand quality standards
Regularly review and analyze customer feedback to identify areas for improvement
Utilize technology and automation to streamline processes and
Top trending discussions
posted on 15 Jan 2025
I applied via Company Website and was interviewed before Jan 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2020. There were 2 interview rounds.
About to reduce AT&C loss and T&D loss control method
Supply restoration involves identifying the cause of the issue, implementing a solution, and creating a safety zone to prevent future incidents.
Identify the root cause of the supply disruption, such as equipment failure or human error.
Implement a plan to restore the supply, which may involve repairing equipment, rerouting resources, or contacting suppliers.
Create a safety zone by implementing preventive measures, such ...
posted on 1 Mar 2024
To improve SHR, focus on optimizing staff scheduling, training, and communication.
Implement efficient staff scheduling to ensure adequate coverage during peak hours
Provide regular training and development opportunities to improve staff skills and performance
Enhance communication channels between staff members and management to address any issues or concerns promptly
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2023. There were 3 interview rounds.
Scope of Renewable energy in India
Current is the flow of electric charge in a circuit.
Current is measured in Amperes (A).
It is the rate of flow of electric charge through a conductor.
Current flows from the positive terminal to the negative terminal in a circuit.
There are two types of current - direct current (DC) and alternating current (AC).
Conductors diameter can be calculated using the formula: diameter = sqrt((4 * area) / pi)
Calculate the area of the conductor (usually circular) using the formula: area = pi * (radius^2)
Determine the radius of the conductor
Use the formula: diameter = sqrt((4 * area) / pi) to calculate the diameter
I applied via Campus Placement and was interviewed before Nov 2022. There were 3 interview rounds.
Any topic such as bullet train, race, education, GSt etc
The ratio of cement, sand, and aggregate in M20 concrete is 1:1.5:3.
The ratio of cement to sand to aggregate is 1:1.5:3 in M20 concrete.
For every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.
This ratio ensures the desired strength and workability of the concrete mix.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
937
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
672
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
401
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
383
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
248
salaries
| ₹0 L/yr - ₹0 L/yr |
NTPC
Tata Power
Reliance Power
JSW Energy