Upload Button Icon Add office photos

Filter interviews by

Accord Synergy Project Engineer Interview Questions, Process, and Tips

Updated 25 Apr 2024

Accord Synergy Project Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What are the network operator in india
  • Ans. 

    Some of the major network operators in India are Airtel, Vodafone Idea, Reliance Jio, and BSNL.

    • Airtel is one of the largest telecom operators in India, offering services like mobile, broadband, and digital TV.

    • Vodafone Idea is a merger of Vodafone India and Idea Cellular, providing mobile services across the country.

    • Reliance Jio is known for its 4G network and affordable data plans, disrupting the telecom market in Indi...

  • Answered by AI
  • Q2. What is 2G,3G and 4G
  • Ans. 

    2G, 3G, and 4G are generations of mobile network technology, each offering faster data speeds and improved capabilities.

    • 2G refers to second-generation mobile networks, providing basic voice and text services.

    • 3G is the third generation, offering faster data speeds for internet browsing and multimedia applications.

    • 4G is the fourth generation, delivering even faster data speeds, lower latency, and support for advanced ser...

  • Answered by AI
  • Q3. What are the type of tower structure ,GBT,RTTANDRTP
  • Ans. 

    GBT stands for Guyed Tower, RTT stands for Roof Top Tower, and RTP stands for Roof Top Pole.

    • GBT (Guyed Tower) is a type of tower structure supported by guy wires.

    • RTT (Roof Top Tower) is a tower structure installed on the roof of a building.

    • RTP (Roof Top Pole) is a pole structure installed on the roof of a building.

  • Answered by AI
  • Q4. Type of sim card
  • Ans. 

    The type of SIM card refers to the physical size and shape of the SIM card, such as standard, micro, or nano.

    • Types of SIM cards include standard, micro, and nano sizes

    • Standard SIM cards are the largest, micro SIM cards are smaller, and nano SIM cards are the smallest

    • Different devices may require different types of SIM cards

  • Answered by AI
  • Q5. What is alpha, beta and gamma sector
  • Ans. 

    Alpha, beta, and gamma sectors are divisions used in various industries to categorize different areas or components.

    • Alpha sector typically refers to the first or primary sector in a system or project

    • Beta sector usually represents the secondary or intermediate sector

    • Gamma sector often denotes the tertiary or final sector

    • These divisions can be used in project management, software development, manufacturing, etc.

  • Answered by AI

Project Engineer Jobs at Accord Synergy

View all

Interview questions from similar companies

Interview Questionnaire 

23 Questions

  • Q1. Bill of material of 1 KM 11 KV line
  • Ans. 

    The bill of material for a 1 KM 11 KV line includes various components such as conductors, insulators, transformers, and poles.

    • Conductors: Copper or aluminum cables used to transmit electricity.

    • Insulators: Materials like porcelain or polymer used to support and isolate the conductors.

    • Transformers: Devices used to step up or step down the voltage.

    • Poles: Structures to support the conductors and maintain their position.

    • Ot...

  • Answered by AI
  • Q2. Bill of material of 1 KM AB cable line
  • Ans. 

    The bill of material for a 1 KM AB cable line includes various components.

    • The cable itself

    • Insulators

    • Connectors

    • Poles or towers

    • Grounding equipment

    • Hardware such as bolts and clamps

    • Tools for installation

    • Safety equipment

    • Transportation costs

    • Labor costs

  • Answered by AI
  • Q3. Bill of material of 1KM underground line 33 KV ,11,KV,LT lines
  • Ans. 

    The bill of material for a 1KM underground line with 33KV, 11KV, and LT lines.

    • The bill of material should include all necessary components for the underground line.

    • Components may include cables, transformers, switchgear, and other electrical equipment.

    • The quantity of each component should be specified in the bill of material.

    • The bill of material should also include any necessary accessories such as clamps, connectors,

  • Answered by AI
  • Q4. Testing commissioning of RMU ,relay setting
  • Ans. 

    Testing and commissioning of RMU and relay setting is a crucial aspect of project engineering.

    • Testing and commissioning of RMU involves verifying the functionality of the switchgear and ensuring it is safe for operation.

    • Relay setting involves configuring the protection relays to ensure they operate correctly in the event of a fault.

    • Testing and commissioning should be carried out in accordance with relevant standards an...

  • Answered by AI
  • Q5. Transformer earthing
  • Q6. What is lightning arrestor
  • Ans. 

    A lightning arrestor is a device used to protect electrical equipment from lightning strikes.

    • It is also known as a surge arrester or lightning diverter.

    • It works by providing a low-impedance path for lightning current to flow to the ground.

    • It is commonly used in power distribution systems, telecommunication networks, and buildings.

    • Examples include metal oxide varistors, gas discharge tubes, and carbon block arrestors.

  • Answered by AI
  • Q7. Soil conductivity test
  • Q8. Transformer testing
  • Q9. ACSR conductor testing ABC testing Pannel testing Structure testing
  • Q10. Earthing Earthing of transformer Earthing of lightning arrester Earthing of sub station Earthing of single pole Earthing of pannels
  • Q11. What is discharge rods
  • Ans. 

    Discharge rods are grounding devices used to discharge static electricity from equipment or machinery.

    • Also known as grounding rods or earthing rods

    • Typically made of copper or aluminum

    • Used in industries such as oil and gas, chemical, and manufacturing

    • Prevents damage to equipment and potential safety hazards

    • Example: Discharge rods are commonly used in refineries to prevent explosions caused by static electricity buildup.

  • Answered by AI
  • Q12. Size of conductors Size of cables
  • Ans. 

    The size of conductors and cables is an important factor in determining their electrical properties and performance.

    • The size of a conductor is determined by its cross-sectional area, which affects its resistance and current-carrying capacity.

    • Cable size is determined by the current it needs to carry and the distance it needs to travel.

    • Larger conductors and cables can carry more current and have lower resistance, but may...

  • Answered by AI
  • Q13. What is GTP What is MQP What is FQP
  • Ans. 

    GTP is a protocol used in cellular communication. MQP and FQP are not commonly used acronyms.

    • GTP stands for GPRS Tunnelling Protocol

    • It is used in cellular communication to allow data transfer between different networks

    • MQP and FQP are not commonly used acronyms and may refer to specific organizations or products

  • Answered by AI
  • Q14. Transformer oil testing
  • Q15. Cable insulation testing Continuity testing High pot test
  • Q16. What is HDD machine
  • Ans. 

    HDD machine is a drilling machine used for horizontal directional drilling.

    • HDD stands for Horizontal Directional Drilling

    • It is used for underground drilling without disturbing the surface

    • It is commonly used for laying pipelines, cables, and conduits

    • The machine uses a drill stem and a drilling fluid to bore through the ground

    • It requires skilled operators and engineers to operate and plan the drilling process

  • Answered by AI
  • Q17. PSC pole STP pole RS joist pole Rail pole
  • Q18. HDPE PIPE GI PIPE PLB duct
  • Q19. Chemical earthing Electrical earthing
  • Q20. Jointing of cables Jointing of conductors
  • Ans. 

    Jointing of cables and conductors is a crucial aspect of project engineering.

    • Jointing involves connecting two or more cables or conductors to ensure continuity of electrical flow.

    • Various methods of jointing include crimping, soldering, and welding.

    • Factors such as the type of cable, voltage, and current capacity must be considered when selecting a jointing method.

    • Proper insulation and sealing of joints is essential to p...

  • Answered by AI
  • Q21. Tell me about yourself
  • Ans. 

    Experienced project engineer with a background in civil engineering and a passion for problem-solving and team collaboration.

    • Bachelor's degree in Civil Engineering

    • 5+ years of experience in project management

    • Proficient in AutoCAD and project management software

    • Strong communication and leadership skills

    • Successfully led a team in completing a major infrastructure project on time and within budget

  • Answered by AI
  • Q22. Previous company and project details
  • Q23. Salary discussion

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Oprical fiber

Interview Preparation Tips

Interview preparation tips for other job seekers - All question od OFC project , Rout survey, ROW solve, T&D (HDD, OT) ,blowing ,spliceing,chamber & Rout markar installation,Rout AT, and all rout document part

Interview Questionnaire 

1 Question

  • Q1. They are asking for my previous experience details & FTTH,NLD,MT, related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boq of 1 KM 11 kV line.
  • Q2. Boq of 1 km LT line
  • Ans. 

    BOQ of 1 km LT line is a document that lists all the items required for the construction of a 1 km low tension line.

    • BOQ stands for Bill of Quantities

    • The BOQ includes details of materials, quantities, and prices

    • The BOQ helps in estimating the total cost of the project

    • Example items in the BOQ for a 1 km LT line: conductor, insulators, poles, transformers, hardware fittings, etc.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basics of site. 11 KV, LT, Distribution Transformer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Standerd size of brick
  • Ans. 

    Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches.

    • Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches

    • Brick sizes can vary slightly depending on the manufacturer or region

    • Bricks are commonly used in construction for building walls, pavements, and other structures

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Promises,async await,callback,api integration
Round 2 - Technical 

(1 Question)

  • Q1. Performance optimization,usecallback,let const var
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Lte architecture and ip based questions
Round 3 - Technical 

(1 Question)

  • Q1. Lte architecture, ip based
Round 4 - Technical 

(1 Question)

  • Q1. Lte architecture and ip
Round 5 - HR 

(1 Question)

  • Q1. What is region for job change and salary expectations
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Ask salary expectations
  • Q2. Salary Discussion and relocation process
  • Q3. Dacumentation and onbording
Round 3 - Technical 

(2 Questions)

  • Q1. Alarm troublesooting otn
  • Q2. OTN fundamental troubleshooting.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically strong
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding working profile
Round 3 - HR 

(1 Question)

  • Q1. Personal details

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Accord Synergy Interview FAQs

How many rounds are there in Accord Synergy Project Engineer interview?
Accord Synergy interview process usually has 1 rounds. The most common rounds in the Accord Synergy interview process are Technical.
How to prepare for Accord Synergy Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Accord Synergy. The most common topics and skills that interviewers at Accord Synergy expect are Installation, LTE, BTS Installation, Calibration and Project Coordination.
What are the top questions asked in Accord Synergy Project Engineer interview?

Some of the top questions asked at the Accord Synergy Project Engineer interview -

  1. What are the type of tower structure ,GBT,RTTAND...read more
  2. what are the network operator in in...read more
  3. what is alpha, beta and gamma sec...read more

Tell us how to improve this page.

Accord Synergy Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Accord Synergy Project Engineer Salary
based on 25 salaries
₹1.9 L/yr - ₹4 L/yr
49% less than the average Project Engineer Salary in India
View more details

Accord Synergy Project Engineer Reviews and Ratings

based on 21 reviews

4.4/5

Rating in categories

2.8

Skill development

3.5

Work-life balance

2.8

Salary

3.3

Job security

3.3

Company culture

2.4

Promotions

3.4

Work satisfaction

Explore 21 Reviews and Ratings
Project Engineer

Mumbai Suburban,

Panvel

+1

5-10 Yrs

₹ 5-15 LPA

Explore more jobs
Project Engineer
25 salaries
unlock blur

₹1.9 L/yr - ₹4 L/yr

RF Engineer
25 salaries
unlock blur

₹2.3 L/yr - ₹3.8 L/yr

Project Coordinator
16 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

RF Drive Test Engineer
11 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Commercial Executive
8 salaries
unlock blur

₹1.7 L/yr - ₹2 L/yr

Explore more salaries
Compare Accord Synergy with

Sterlite Technologies

3.8
Compare

Cisco

4.2
Compare

Redington

4.0
Compare

Vindhya Telelinks

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview