Upload Button Icon Add office photos

Filter interviews by

Accord Synergy Project Manager Interview Questions and Answers

Updated 10 Aug 2022

Accord Synergy Project Manager Interview Experiences

1 interview found

Project Manager Interview Questions & Answers

user image Ubantu Srikanta

posted on 10 Aug 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

A group discussion about Economy of India.

Round 3 - Technical 

(1 Question)

  • Q1. They asked about java programming language.

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe yourself and one day you will get success.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work experience , Previous company work,
Round 3 - Technical 

(1 Question)

  • Q1. OTDR,LSPM,Link budget,Field work

Interview Preparation Tips

Interview preparation tips for other job seekers - When you give the answer of HR Questions,Be confident,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Quantity of steel in over head tanks of various capacities.
  • Ans. 

    The quantity of steel in overhead tanks varies based on their capacities.

    • The quantity of steel required for an overhead tank depends on the size and shape of the tank.

    • Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.

    • Different capacities of overhead tanks will require different amounts of steel.

    • For example, a 1000 liter tank will require less steel compare

  • Answered by AI
  • Q2. How many days a over head tank take to finish?
  • Ans. 

    The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.

    • Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.

    • For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.

    • Effi...

  • Answered by AI
  • Q3. Process of hydro pressure tesing of line .
  • Ans. 

    Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.

    • Fill the line with water to the required pressure level

    • Monitor the pressure for a specified duration to ensure it remains stable

    • Inspect the line for any leaks or weaknesses

    • Release the pressure and drain the water from the line after testing

    • Document the results and any necessary repairs or maintenan

  • Answered by AI
  • Q4. Full form of HDPE pipe .
  • Ans. 

    High Density Polyethylene pipe

    • HDPE stands for High Density Polyethylene

    • HDPE pipes are commonly used in water supply, drainage, and gas distribution systems

    • They are known for their durability, flexibility, and resistance to corrosion

    • HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects

  • Answered by AI
  • Q5. Process of air valve, sluice valve and scour valve and fire hydrant fixing .
Round 2 - Technical 

(2 Questions)

  • Q1. Vendor development of execution work .
  • Ans. 

    Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.

    • Identify potential vendors who can provide the required services or products

    • Negotiate contracts and agreements with vendors to establish terms and conditions

    • Monitor vendor performance to ensure they meet project requirements and deadlines

    • Provide feedback to vendors to improve their performa...

  • Answered by AI
  • Q2. Team management
Round 3 - HR 

(3 Questions)

  • Q1. Previous employment salery
  • Q2. Previous employment roles and responsibilities
  • Ans. 

    Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.

    • Led cross-functional teams to ensure project goals were met

    • Developed project plans and schedules

    • Monitored project progress and reported updates to stakeholders

    • Identified and resolved project issues and risks

    • Managed project budgets and resources effectively

  • Answered by AI
  • Q3. Expectations of salery
  • Ans. 

    I have researched the average salary range for Project Managers in this industry and location.

    • Researched average salary range for Project Managers in industry and location

    • Considered my experience, skills, and qualifications when determining salary expectations

    • Open to negotiation based on benefits package and growth opportunities

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Stay Rod Length, 11kv line BOQ FOR 1 KM, Substation SLD etc
  • Q2. 1600mm, 21 nos Pole with DP ,V Cross ,1 nos DP with Belting & bracing
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Show your salary in Bank statement, will provide Bike conveyance rs 5 rs/ km, Guest house facility mob. Reimburse etc

Interview Preparation Tips

Topics to prepare for Vindhya Telelinks Assistant Manager interview:
  • Substation, 11kv line
Interview preparation tips for other job seekers - Most of the time they will not enhanced salary,almost time they pay same as previous salary. Or below salary

Regarding PF it should be confirmed, I will be deducted or not.

I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Water Division related on question with planning and billing. They enquiry related to project deep and deep and asking about the fix the issue.
  • Q2. Filter house methodology and construction related.

Interview Preparation Tips

Interview preparation tips for other job seekers - If they need hire you otherwise they egnor you after round of round interview happen.
One step HR and then 2-3step of technical round related to current project.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Job profile technical questions discussion
Round 3 - Group Discussion 

Multiple questions for technical rounds

Round 4 - HR 

(1 Question)

  • Q1. Finely HR discussion salery and joining process
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Project monitoring
  • Q2. Project handling
Round 2 - One-on-one 

(1 Question)

  • Q1. Project completion
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I applied via Job Portal and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. One and one round with Project Delivery manager and then HR round
  • Q2. Technical and project related questions which relevant with post i applied
Round 3 - HR 

(1 Question)

  • Q1. About the experience on related field.

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Simple process..basic questions about your profile and about skills you mention in your CV

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your roles in your current organization. Ask them questions about the roles they are offering because their JD is not much clear.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About ourself, Work experience, Project management, Engineering knowledge and Quality management
Round 3 - Technical 

(1 Question)

  • Q1. Higher level management questions
Round 4 - HR 

(1 Question)

  • Q1. General Question, Salary expectations and other

Interview Preparation Tips

Interview preparation tips for other job seekers - Good luck and best wishes. Question may get changed depending on the position what you are going to apply.

Accord Synergy Interview FAQs

How many rounds are there in Accord Synergy Project Manager interview?
Accord Synergy interview process usually has 3 rounds. The most common rounds in the Accord Synergy interview process are Resume Shortlist, Group Discussion and Technical.
How to prepare for Accord Synergy Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Accord Synergy. The most common topics and skills that interviewers at Accord Synergy expect are Cfo, Electrical Works, ExtJS, LTE and Pivot Table.

Tell us how to improve this page.

Interview Questions from Similar Companies

Cisco Interview Questions
4.2
 • 375 Interviews
Tejas Networks Interview Questions
4.0
 • 76 Interviews
Redington Interview Questions
4.0
 • 34 Interviews
Avantel Interview Questions
3.9
 • 13 Interviews
View all
Accord Synergy Project Manager Salary
based on 6 salaries
₹4.8 L/yr - ₹6.2 L/yr
68% less than the average Project Manager Salary in India
View more details

Accord Synergy Project Manager Reviews and Ratings

based on 4 reviews

1.2/5

Rating in categories

1.1

Skill development

2.1

Work-life balance

1.1

Salary

1.1

Job security

1.2

Company culture

2.0

Promotions

1.1

Work satisfaction

Explore 4 Reviews and Ratings
Project Engineer
25 salaries
unlock blur

₹1.9 L/yr - ₹4 L/yr

RF Engineer
25 salaries
unlock blur

₹2.3 L/yr - ₹3.8 L/yr

Project Coordinator
16 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

RF Drive Test Engineer
11 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Commercial Executive
8 salaries
unlock blur

₹1.7 L/yr - ₹2 L/yr

Explore more salaries
Compare Accord Synergy with

Sterlite Technologies

3.8
Compare

Cisco

4.2
Compare

Redington

4.0
Compare

Vindhya Telelinks

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview