I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
Top trending discussions
posted on 2 Sep 2024
I applied via Campus Placement and was interviewed in Mar 2024. There were 4 interview rounds.
Computer based test mcqs
posted on 13 Oct 2024
Cement production involves a series of steps including crushing, grinding, heating, and mixing raw materials to form clinker.
Crushing: Raw materials like limestone, clay, and iron ore are crushed into small pieces.
Grinding: The crushed materials are then ground into a fine powder.
Heating: The powdered materials are heated in a kiln to a very high temperature.
Mixing: The heated materials are mixed with gypsum to form ce...
Sub-grade drilling is the process of drilling holes in the ground to prepare for blasting or excavation in mining operations.
Sub-grade drilling is done to create holes for explosives to be placed in order to break up rock or soil.
It is an essential step in the mining process to create space for excavation equipment to access the desired material.
The depth and spacing of the holes drilled will depend on the type of mate...
posted on 13 Nov 2023
I was interviewed in Oct 2023.
I am currently operating various equipment in the plant including boilers, turbines, pumps, and control systems.
Boilers
Turbines
Pumps
Control systems
The main parameter of roller press is the gap between the rollers.
The main parameter of roller press is the gap between the rollers, which determines the size of the material particles after compression.
The gap between the rollers can be adjusted to control the pressure and throughput of the roller press.
Maintaining the optimal gap between the rollers is crucial for efficient operation and desired product quality.
Skew can be controlled by proper alignment of reinforcement bars and using shear reinforcement.
Ensure proper alignment of reinforcement bars during construction.
Use shear reinforcement like stirrups or inclined bars to control skew.
Properly design and detail the structural elements to resist skew forces.
Regular inspection and maintenance to prevent skew from occurring.
Yes, I have operated VRM in previous projects.
Yes, I have experience operating VRM in previous projects.
I am familiar with the functions and capabilities of VRM.
I have successfully utilized VRM to achieve project goals and objectives.
I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.
posted on 30 Jun 2024
posted on 17 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Mass transfer &heat transfers
based on 6 reviews
Rating in categories
Assistant Manager
412
salaries
| ₹4 L/yr - ₹14.8 L/yr |
Deputy Manager
263
salaries
| ₹6.7 L/yr - ₹21 L/yr |
Manager
162
salaries
| ₹10.6 L/yr - ₹30 L/yr |
Senior Executive
158
salaries
| ₹2.8 L/yr - ₹8.3 L/yr |
Senior Engineer
130
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Ambuja Cements
UltraTech Cement
Shree Cement
The Ramco Cements