Filter interviews by
I was interviewed in Jun 2024.
The formula of benzene is C6H6.
Benzene consists of a ring of six carbon atoms, each bonded to one hydrogen atom.
The molecular formula for benzene is C6H6.
The structural formula of benzene is represented as a hexagon with alternating double bonds.
Toluene can be prepared by the catalytic reforming of petroleum naphtha.
Toluene is commonly produced by the catalytic reforming of petroleum naphtha.
The process involves heating the naphtha to high temperatures in the presence of a catalyst.
The resulting mixture is then distilled to separate out the toluene.
Another method involves the methylation of benzene using methanol in the presence of a catalyst.
I applied via Walk-in and was interviewed in May 2021. There were 3 interview rounds.
Boilers are vessels that heat water or other fluids to generate steam or hot water for various applications.
Boilers are used in industries, commercial buildings, and residential homes.
They work by transferring heat from a fuel source to water or other fluids.
The steam or hot water produced by boilers can be used for heating, power generation, or process applications.
There are different types of boilers, including fire-...
A pump is a mechanical device used to move fluids from one place to another. There are various types of pumps.
Pumps are used in various industries such as oil and gas, water treatment, and manufacturing.
Types of pumps include centrifugal pumps, reciprocating pumps, and rotary pumps.
Centrifugal pumps are commonly used for low viscosity fluids, while reciprocating pumps are suitable for high-pressure applications.
Example...
A cooling tower is a device that removes heat from a process or building by transferring it to the atmosphere.
Cooling towers are commonly used in industrial processes and HVAC systems.
They work by evaporating a small portion of the water being circulated, which removes heat from the remaining water.
The cooled water is then recirculated back into the system.
Cooling towers can be classified into different types, such as ...
Parameters to consider when building a cooling tower
Size and capacity requirements
Location and environmental factors
Design and construction materials
Water source and quality
Cooling tower type and configuration
Safety and regulatory compliance
Parameters considered while building a boiler
Boiler type and size
Fuel type and availability
Operating pressure and temperature
Efficiency and emissions
Safety features and regulations
Maintenance requirements
Cost and budget constraints
Aarti Drugs interview questions for popular designations
Top trending discussions
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
The manufacturing process of semi-finished products involves several steps including casting, rolling, forging, and machining.
The process starts with melting the raw material in a furnace.
The molten metal is then poured into a mold to create the desired shape.
The semi-finished product is then subjected to rolling, forging, or extrusion to improve its mechanical properties.
After that, the product is machined to achieve ...
Challenge test is required to ensure the reliability and accuracy of compression machines and frequency.
Challenge test helps to identify any potential issues with the compression machine and frequency.
It ensures that the machine is producing accurate and consistent results.
The test involves subjecting the machine to extreme conditions to see how it performs.
For example, a compression machine may be tested by compressin...
There are various types of tooling used in production, including cutting, forming, and assembly tools.
Cutting tools: used to remove material from a workpiece, such as drills, saws, and milling cutters
Forming tools: used to shape a workpiece without removing material, such as dies and molds
Assembly tools: used to join multiple components together, such as screws, bolts, and rivets
Other types of tooling include measuring
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
I am the ideal candidate for the Production Officer position because of my extensive experience in production management and my strong problem-solving skills.
I have a proven track record of successfully managing production operations and meeting production targets.
I possess excellent organizational and time management skills, ensuring efficient production processes.
I am highly skilled in identifying and resolving produ...
posted on 25 Mar 2021
I applied via Referral and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jun 2024. There was 1 interview round.
The duration of Aarti Drugs interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 2 interviews
Interview experience
based on 307 reviews
Rating in categories
Production Officer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
QC Officer
91
salaries
| ₹0 L/yr - ₹0 L/yr |
QC Chemist
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Maintenance Engineer
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Control Officer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Alembic Pharmaceuticals
Sun Pharmaceutical Industries
Cipla
DRJ & CO