Filter interviews by
Top trending discussions
I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.
posted on 20 Dec 2024
Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.
Over 5 years of experience in site supervision
Strong knowledge of construction processes and safety regulations
Effective communication skills with team members and clients
Managed multiple projects simultaneously, ensuring deadlines were met
Implemented cost-saving measures without compro
I am passionate about leading teams and ensuring projects are completed successfully.
I have a strong background in construction and project management.
I enjoy the challenge of overseeing multiple tasks and problem-solving on site.
I am motivated by the opportunity to mentor and develop team members.
I thrive in fast-paced environments and am dedicated to delivering high-quality results.
My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.
Strong leadership skills
Excellent communication abilities
Proactive approach to problem-solving
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.
I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.
I can be overly self-critical, which can affect my confidence in certain situations.
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I am interested to Aptitude test
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Spray line work involves operating and maintaining fire hoses and nozzles to extinguish fires.
Spray line work includes connecting hoses to water sources, aiming nozzles at the base of the fire, and controlling water flow.
Firefighters must be trained in proper techniques for using spray lines to effectively combat fires.
Regular maintenance of hoses and nozzles is essential to ensure they function properly during emergen
A fire protection system that uses water mist to suppress fires
Spray system uses fine water droplets to extinguish fires
It is effective in suppressing fires in enclosed spaces
Commonly used in areas where traditional sprinkler systems may cause water damage
Examples include high-pressure water mist systems and low-pressure water mist systems
A jockey pump is a small pump used to maintain pressure in a fire protection system.
Jockey pumps are typically used in conjunction with larger fire pumps to ensure a constant pressure in the system.
They are usually set at a lower pressure than the main fire pump to prevent frequent starts and stops.
Jockey pumps are often used in high-rise buildings, industrial facilities, and other locations where maintaining pressure ...
I was interviewed in Sep 2024.
Aptitude 25 marks, reasoning 25 marks , English 25 marks and technical 25 marks & questions
Power systems refer to the network of electrical components used to generate, transmit, and distribute electricity.
Power systems consist of power generation plants, transmission lines, substations, and distribution networks.
They are designed to ensure a reliable supply of electricity to homes, businesses, and industries.
Power systems can be interconnected to form a grid, allowing for the sharing of electricity between ...
My favorite subject is computer science because I enjoy problem-solving and creating innovative solutions.
I love learning about algorithms and data structures
I enjoy programming in languages like Java and Python
I find networking and cybersecurity fascinating
I am interested in artificial intelligence and machine learning
The laws of thermodynamics are fundamental principles that govern the behavior of energy and matter in the universe.
First Law: Energy cannot be created or destroyed, only transferred or converted.
Second Law: The entropy of a closed system will never decrease over time.
Third Law: As temperature approaches absolute zero, the entropy of a system approaches a minimum value.
Examples: A car engine converting fuel into motion...
Defence technology and modern tactics to handle terrotism
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
posted on 4 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.
based on 30 reviews
Rating in categories
NOC Engineer
12
salaries
| ₹2.8 L/yr - ₹3.4 L/yr |
Technical Support Engineer
12
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Test Engineer
6
salaries
| ₹2.1 L/yr - ₹3.8 L/yr |
Data Analyst
6
salaries
| ₹2.6 L/yr - ₹4.5 L/yr |
Senior Software Engineer
5
salaries
| ₹6.1 L/yr - ₹12 L/yr |
Suzlon Group
Azure Power
Hero Future Energies
ReNew