3 Questions

  • Q1. Ratio of M10 ,M25 concrete grades?
  • Ans. 

    The ratio of M10 and M25 concrete grades is 1:3.

    • M10 concrete has a mix ratio of 1:3:6 (cement:sand:aggregate)

    • M25 concrete has a mix ratio of 1:1:2 (cement:sand:aggregate)

    • The ratio of M10 to M25 concrete grades is 1:3

  • Answered by AI
  • Q2. Formula to calculate the weight of steel?
  • Ans. 

    The weight of steel can be calculated using a simple formula.

    • The formula to calculate the weight of steel is: weight = volume x density

    • The density of steel is around 7850 kg/m³

    • The volume of steel can be calculated using the dimensions of the steel piece

    • For example, the weight of a steel plate with dimensions 1m x 2m x 0.01m would be: weight = 1m x 2m x 0.01m x 7850 kg/m³ = 157 kg

  • Answered by AI
  • Q3. The formula is D²÷162.2×L.
  • Ans. 

    The formula is used to calculate the weight of a steel bar.

    • D is the diameter of the steel bar in millimeters

    • L is the length of the steel bar in meters

    • 162.2 is the constant used for the density of steel

    • The formula is commonly used in construction and engineering projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give your best. Tell the interviewers about your knowledge your abilities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is wellding quality absorved
  • Ans. 

    Welding quality is the measure of how well a weld meets the required standards and specifications.

    • Welding quality is determined by factors such as weld strength, appearance, and adherence to welding procedures.

    • It is important to ensure that the weld is free from defects such as cracks, porosity, and incomplete fusion.

    • Quality control measures, such as non-destructive testing, are used to assess the integrity of the weld...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - MEP curriculum and computer based my project

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions branch related
Round 3 - Group Discussion 

HR technical department group discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - KEC company is a very good company it sees all the employees with one eye and has good behavior

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

I applied via Walk-in and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

What is your qualifications and your skills

Round 3 - Group Discussion 

Tell anyone what you know about the site.

Interview Preparation Tips

Topics to prepare for Quess Site Engineer interview:
  • Technical Skills
  • Computer
Interview preparation tips for other job seekers - I know bar ending and layout
Basic computer skills

I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was very easy and good

I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Process of RO
  • Ans. 

    RO (Reverse Osmosis) is a water purification process that uses a semipermeable membrane to remove ions, molecules, and larger particles from drinking water.

    • RO process involves the use of a high-pressure pump to force water through a semipermeable membrane.

    • The membrane allows water molecules to pass through while blocking impurities.

    • RO can remove contaminants like dissolved salts, bacteria, viruses, and heavy metals fro...

  • Answered by AI
  • Q2. Purpose of ACF.
  • Ans. 

    ACF stands for AutoCAD Civil 3D Feature. It is used for creating and managing design elements in civil engineering projects.

    • ACF is a tool in AutoCAD Civil 3D software.

    • It allows site engineers to create and manage design elements such as roads, intersections, and grading.

    • ACF helps in generating accurate 3D models of the site, including surfaces, alignments, and profiles.

    • It enables engineers to analyze and optimize desig...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be shy spring the mock, and try to speak up

Skills evaluated in this interview

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Question related to civil engineering and related to my past experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic and technical questions will be asked.RCC and building material is the main subject thats the interviewer ask.

21st Century Enviro Engineers Interview FAQs

What are the top questions asked in 21st Century Enviro Engineers Site Engineer interview?

Some of the top questions asked at the 21st Century Enviro Engineers Site Engineer interview -

  1. Formula to calculate the weight of ste...read more
  2. Ratio of M10 ,M25 concrete grad...read more
  3. The formula is D²÷162.2�...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Deltax Interview Questions
2.7
 • 85 Interviews
Practo Interview Questions
3.1
 • 74 Interviews
Wayfair Interview Questions
3.6
 • 57 Interviews
KLA Interview Questions
3.7
 • 44 Interviews
Busibud Interview Questions
4.0
 • 42 Interviews
View all
Civil Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Mechanical Engg. Design
3 salaries
unlock blur

₹2.7 L/yr - ₹4 L/yr

Plant Operator
3 salaries
unlock blur

₹0.8 L/yr - ₹1 L/yr

Explore more salaries
Compare 21st Century Enviro Engineers with

Amazon Sellers Services

4.0
Compare

Primus Global Technologies

3.9
Compare

GAMMON INDIA

3.8
Compare

Practo

3.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview