Filter interviews by
I applied via Referral and was interviewed before Mar 2022. There were 3 interview rounds.
The density of concrete varies depending on the mix design and can range from 1400 to 2500 kg/m³.
The density of concrete is typically measured in kilograms per cubic meter (kg/m³).
The density of concrete can vary depending on the mix design, which includes the ratio of cement, water, and aggregates.
The density of concrete can range from 1400 to 2500 kg/m³, with higher densities typically indicating stronger and more du...
The maximum temperature of concrete permitted is 70-75°C.
High temperatures can cause cracks and weaken the concrete.
The maximum temperature is usually achieved during curing.
The temperature should be monitored and controlled during the entire process.
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 17 Oct 2024
Good process from management side
Least count is the smallest measurement that can be taken by an instrument.
It is the smallest value that can be measured by an instrument.
It is determined by the precision of the instrument.
For example, the least count of a ruler with millimeter markings is 1 mm.
It is important to consider the least count when taking measurements to ensure accuracy.
Stress is the force applied per unit area, while strain is the deformation caused by stress.
Stress is a measure of the force applied to a material per unit area
Strain is the measure of the deformation caused by stress
Stress and strain are related by the material's elasticity and its ability to resist deformation
Stress can be tensile, compressive, or shear
Strain can be elastic, plastic, or failure
Examples include stretc...
Important quality documents include SOPs, work instructions, quality manuals, and validation protocols.
Standard Operating Procedures (SOPs) outline step-by-step instructions for performing tasks
Work instructions provide detailed instructions for specific tasks
Quality manuals outline the quality management system of an organization
Validation protocols ensure that equipment, processes, and systems meet predetermined spec
I applied via Approached by Company and was interviewed before Apr 2022. There were 4 interview rounds.
Knowledge of listening
Skills required for software development depend on the platform and technology used.
Proficiency in programming languages such as Java, Python, C++, etc.
Knowledge of software development methodologies like Agile, Waterfall, etc.
Familiarity with software development tools like Git, JIRA, etc.
Understanding of database management systems like MySQL, Oracle, etc.
Ability to work with different operating systems like Windows,...
My area of specialization is web development with expertise in front-end technologies like React and Angular.
Expertise in front-end technologies like React and Angular
Proficient in back-end technologies like Node.js and Express
Experience in developing responsive and mobile-first web applications
Familiarity with database technologies like MongoDB and MySQL
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
based on 2 interviews
Interview experience
based on 53 reviews
Rating in categories
Planning Engineer
13
salaries
| ₹6.5 L/yr - ₹14.5 L/yr |
Testing & Commissioning Engineer
10
salaries
| ₹6 L/yr - ₹20 L/yr |
HSE Advisor
8
salaries
| ₹6 L/yr - ₹17 L/yr |
QC Inspector
8
salaries
| ₹10 L/yr - ₹14 L/yr |
Civil Engineer
7
salaries
| ₹7.3 L/yr - ₹17.5 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions