I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 3 interview rounds.
The density of concrete varies depending on the mix design and can range from 1400 to 2500 kg/m³.
The density of concrete is typically measured in kilograms per cubic meter (kg/m³).
The density of concrete can vary depending on the mix design, which includes the ratio of cement, water, and aggregates.
The density of concrete can range from 1400 to 2500 kg/m³, with higher densities typically indicating stronger and more du...
The maximum temperature of concrete permitted is 70-75°C.
High temperatures can cause cracks and weaken the concrete.
The maximum temperature is usually achieved during curing.
The temperature should be monitored and controlled during the entire process.
Top trending discussions
I was interviewed in Jan 2025.
I was interviewed in Jan 2025.
posted on 22 Jan 2025
I was interviewed in Dec 2024.
posted on 8 Feb 2025
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 9 Feb 2025
I was interviewed in Aug 2024.
posted on 15 Dec 2024
I was interviewed in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
posted on 25 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Reverse a given string
Use a loop to iterate through the characters of the string
Append each character to a new string in reverse order
Return the reversed string
Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.
Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.
One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.
Another approach is to use a different sorting algorithm that can handl...
based on 2 interviews
Interview experience
based on 52 reviews
Rating in categories
Planning Engineer
13
salaries
| ₹6.5 L/yr - ₹14.5 L/yr |
Testing & Commissioning Engineer
10
salaries
| ₹6 L/yr - ₹20 L/yr |
HSE Advisor
8
salaries
| ₹6 L/yr - ₹17 L/yr |
QC Inspector
8
salaries
| ₹10 L/yr - ₹14 L/yr |
Electrical QC Inspector
7
salaries
| ₹7.2 L/yr - ₹16 L/yr |
Larsen & Toubro Limited
BHEL
Thermax Limited
Tata Power