Filter interviews by
I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
I was interviewed in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
I was interviewed before Jun 2021.
DCA and PLC are commonly used acronyms in the field of engineering.
DCA stands for Direct Current Amplifier, which is a device used to amplify direct current signals.
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
DCA and PLC are essential components in various engineering applications such as industrial automation and control systems.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Process Engineer
325
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
203
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
150
salaries
| ₹0 L/yr - ₹0 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
McDermott International