Upload Button Icon Add office photos

Filter interviews by

Wheels Production & Quality Engineer Interview Questions and Answers

Updated 15 Apr 2022

Wheels Production & Quality Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Apr 2021. There were 4 interview rounds.

Round 1 - Aptitude Test 
Round 2 - Case Study 
Round 3 - Technical 

(1 Question)

  • Q1. Tell about yourself ,
Round 4 - HR 

(1 Question)

  • Q1. Tell about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on the technical background

Interview questions from similar companies

I applied via Company Website and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you handle uncooperative staff?
  • Ans. 

    To handle uncooperative staff, it is important to communicate effectively, address concerns, provide support, and establish clear expectations.

    • Open communication channels to understand the reasons for uncooperativeness

    • Address any concerns or issues raised by the staff

    • Provide necessary support, training, or resources to help staff perform their tasks effectively

    • Establish clear expectations and goals, ensuring everyone u...

  • Answered by AI
  • Q2. How do you insure the quality Engineer and product
  • Ans. 

    To ensure quality, a production & quality engineer can implement various measures such as conducting inspections, implementing quality control processes, and using statistical analysis.

    • Conduct regular inspections to identify any defects or issues in the production process.

    • Implement quality control processes to ensure that products meet the required standards.

    • Use statistical analysis techniques to monitor and improve pr...

  • Answered by AI
  • Q3. Can you describe a recent project in which you successfully implemented quality control procedures?
  • Ans. 

    Implemented quality control procedures in a project for improving product reliability.

    • Identified critical components and their failure modes

    • Developed test plans and procedures to validate component reliability

    • Implemented statistical process control to monitor production process

    • Conducted root cause analysis and implemented corrective actions

    • Reduced product failure rate by 30% and improved customer satisfaction

  • Answered by AI
  • Q4. Can you describe how you investigate production flaws? ...
  • Ans. 

    I investigate production flaws by analyzing data, observing processes, and conducting tests.

    • Collect and analyze data on the production process

    • Observe the production process to identify potential flaws

    • Conduct tests to confirm the cause of the flaw

    • Collaborate with production team to develop solutions

    • Implement solutions and monitor results

    • Document findings and share with relevant stakeholders

  • Answered by AI
  • Q5. Why is a project quality plan important
  • Ans. 

    A project quality plan is important to ensure that the project meets the required quality standards and customer expectations.

    • Helps to identify quality objectives and requirements

    • Defines quality control and assurance activities

    • Ensures compliance with industry standards and regulations

    • Reduces the risk of defects and rework

    • Improves customer satisfaction and trust

    • Provides a framework for continuous improvement

    • Helps to man

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - QE, automating processes is the answer to improving velocity and at the same time eliminate errors that occur due to manual intervention. With DevOps, organizations need to establish QE processes with Shift Left mentality, Automated Quality Assurance, Automation tools, and Continuous Integration to ensure quality from the beginning. This makes embedding QE in Agile and DevOps an urgent action item for organizations. Defining processes and adhering to them help in creating patterns across the organization to determine what is working and the impact of the QE program. Automated processes establish the same communication language across the organization making it a whole-team language and initiative.

Although People create the biggest difference, the selection of the right tool gives an extra edge against the competition. Various tools claiming to do similar things crowd the testing landscape. Mapping these tools against the Testing Quadrants (Read on to find out more about them) is a good starting point but can be overwhelming. This clouds the decision about selecting the right tools and integrating them in current tool chain. Most of the tool selection decisions get highly influenced by vendor marketing, team members’, and self-intuition. It is a good approach to clear the confusion by appointing specialized Quality Engineering consultants to lead the end-to-end QE program by using cutting-edge tools, modern engineering practices, and proprietary testing frameworks.

I applied via Naukri.com

Interview Questionnaire 

2 Questions

  • Q1. Ralated to quality
  • Ans. 

    Quality is the degree of excellence of a product or service.

    • Quality is achieved by meeting customer requirements and expectations.

    • Quality control involves inspecting and testing products to ensure they meet standards.

    • Continuous improvement is essential for maintaining and improving quality.

    • Quality management systems such as ISO 9001 provide a framework for ensuring quality.

    • Poor quality can lead to customer dissatisfact

  • Answered by AI
  • Q2. Related to production

Interview Preparation Tips

Interview preparation tips for other job seekers - interview just happened and no call or no sms
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Technical 

(2 Questions)

  • Q1. Glass manufacturing process
  • Ans. 

    Glass manufacturing involves melting raw materials, shaping the molten glass, and cooling it to form the final product.

    • Raw materials such as silica sand, soda ash, and limestone are melted in a furnace at high temperatures.

    • The molten glass is then shaped using various techniques like blowing, pressing, or drawing.

    • The shaped glass is cooled slowly in an annealing oven to relieve internal stresses and strengthen the glas...

  • Answered by AI
  • Q2. Glass inspection process
Round 2 - HR 

(2 Questions)

  • Q1. What is salary in your company
  • Q2. Which type experience
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Oct 2024. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Veriner caliper
  • Q2. TQM full form and production planning
  • Ans. 

    TQM stands for Total Quality Management. Production planning involves creating a detailed plan of how to produce goods efficiently.

    • TQM focuses on improving quality at every level of the production process

    • It involves continuous improvement, employee involvement, and customer satisfaction

    • Production planning includes setting production goals, scheduling tasks, and allocating resources

    • It aims to optimize production process

  • Answered by AI
Round 2 - Case Study 

BE mechanical engineering

Round 3 - Aptitude Test 

Water pump and oil pump

Round 4 - HR 

(2 Questions)

  • Q1. Tell me u self
  • Q2. Antha year passed
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Assembly BIW production process and their required parameter to meet weld quality
  • Ans. 

    Assembly BIW production process involves various parameters to ensure weld quality.

    • Ensure proper fit-up of components before welding

    • Maintain correct welding parameters such as voltage, current, and travel speed

    • Use appropriate shielding gas and welding consumables

    • Regularly inspect and maintain welding equipment

    • Implement quality control measures such as visual inspection and non-destructive testing

  • Answered by AI
  • Q2. Robotic spot welding knowledge
Round 2 - HR 

(1 Question)

  • Q1. CTC discuss and policy

Interview Preparation Tips

Interview preparation tips for other job seekers - average ok company , not so good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is sheet metal work?
  • Ans. 

    Sheet metal work involves cutting, bending, and shaping thin metal sheets to create various products and components.

    • Involves cutting, bending, and shaping thin metal sheets

    • Commonly used in manufacturing of car bodies, aircraft wings, household appliances, etc.

    • Requires specialized tools such as shears, press brakes, and rollers

    • Can involve processes like punching, stamping, welding, and finishing

  • Answered by AI
  • Q2. Die and punch and hole piercing

Interview Preparation Tips

Interview preparation tips for other job seekers - It good for start not for long term
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Basic general knowledge only
  • Q2. Basic resume questions only
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is 5's and why dowe do? What is 3M and 3K? What is KANBAN and why we use its.?
  • Ans. 

    5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.

    • 5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.

    • 3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is manpower handling? What is Kaizen? Why do we use its? Benifits of Kaizen in company? Difference between kaizen and innovation?
  • Ans. 

    Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.

    • Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.

    • Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Job profile of previous company
  • Ans. 

    The job profile of my previous company involved managing the production process and ensuring efficient operations.

    • Responsible for overseeing the entire production process

    • Developing and implementing production plans and schedules

    • Monitoring and optimizing production efficiency

    • Managing a team of production staff

    • Ensuring compliance with quality standards and safety regulations

    • Identifying and resolving production issues

    • Coll...

  • Answered by AI
  • Q2. About OEE, Productivity, manpower handling

Wheels Interview FAQs

How many rounds are there in Wheels Production & Quality Engineer interview?
Wheels interview process usually has 4 rounds. The most common rounds in the Wheels interview process are Aptitude Test, Case Study and Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Wheels interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

MRF Tyres Interview Questions
3.7
 • 285 Interviews
JBM Group Interview Questions
4.0
 • 247 Interviews
Subros Interview Questions
3.9
 • 158 Interviews
Ceat Tyres Interview Questions
4.0
 • 152 Interviews
Apollo Tyres Interview Questions
4.0
 • 124 Interviews
Spark Minda Interview Questions
3.9
 • 112 Interviews
Gabriel India Interview Questions
4.2
 • 93 Interviews
JK Tyres Interview Questions
3.7
 • 90 Interviews
View all
Assistant Manager
306 salaries
unlock blur

₹4.8 L/yr - ₹10.8 L/yr

Senior Engineer
170 salaries
unlock blur

₹3.6 L/yr - ₹8 L/yr

Graduate Engineer Trainee (Get)
160 salaries
unlock blur

₹1.4 L/yr - ₹3 L/yr

Junior Engineer
156 salaries
unlock blur

₹1.8 L/yr - ₹5.3 L/yr

Engineer
119 salaries
unlock blur

₹2 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Wheels with

Bridgestone India Automotive Products

4.2
Compare

Ceat Tyres

4.0
Compare

Apollo Tyres

4.0
Compare

MRF Tyres

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview