I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. My self and work Experience .

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. What is sedimention?
  • Ans. 

    Sedimentation is the process of settling or deposition of suspended particles in water or wastewater.

    • It is a physical water treatment process.

    • It involves the use of gravity to separate solid particles from water.

    • Sedimentation tanks are used in water treatment plants to remove suspended solids.

    • It is also used in wastewater treatment to remove settleable solids before further treatment.

    • The settled solids are called sludg...

  • Answered by AI
  • Q2. What Is Flock?
  • Ans. 

    Flock is a process of adding chemicals to wastewater to create clusters of particles that can be easily removed.

    • Flock is used in wastewater treatment to remove suspended solids and other impurities.

    • Chemicals like alum or ferric chloride are added to wastewater to create flocs.

    • Flocs are clusters of particles that can be easily removed through sedimentation or filtration.

    • Flock is an important step in the wastewater treat...

  • Answered by AI

Skills evaluated in this interview

I applied via LinkedIn and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Question asked from my CV?

Interview Preparation Tips

Interview preparation tips for other job seekers - make your resume genuinely, avoid unwanted skills that you are not fit for that skill

I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Drawing knowedge and competence
  • Q2. Be ready with full knowledge of isometric drawing druing interview..... Mainly isometric be a detail knowledge
  • Q3. Eye contact
  • Q4. Dress code

Interview Preparation Tips

Interview preparation tips for other job seekers - Your time given is almost 1 hour try to answer every answer spontaneous and rigid and comfirm answers

Interview Questionnaire 

1 Question

  • Q1. Site related

Interview Questionnaire 

1 Question

  • Q1. Besic

Interview Questionnaire 

1 Question

  • Q1. Water spply scheme project
  • Ans. 

    A water supply scheme project involves designing and implementing a system to provide clean water to a community.

    • Identify the water source and assess its quality

    • Design a treatment system to remove impurities

    • Construct pipelines and storage tanks

    • Implement a distribution system to deliver water to households

    • Train community members on maintenance and operation of the system

  • Answered by AI

I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Auto level me TBM kese shift krte hai.
  • Q2. Water supply me DI and HDPE pipe ka Full form kya hai?

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview me concrete se related,Auto level, lab technician se relative questions puchna chaiye.

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 763 Interviews
AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
View all

Wapcos Civil Engineer-Water/Wastewater Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Field Engineer
147 salaries
unlock blur

₹1.7 L/yr - ₹7 L/yr

Civil Engineer
145 salaries
unlock blur

₹2.4 L/yr - ₹9.6 L/yr

Electrical Engineer
81 salaries
unlock blur

₹2.4 L/yr - ₹8.4 L/yr

Site Engineer
71 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Civil Site Engineer
66 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Explore more salaries
Compare Wapcos with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview