A permit to work is a formal written system used to control certain types of work that are identified as potentially hazardous.
Permit to work is used to ensure that work is carried out safely and in accordance with established procedures.
It is typically required for high-risk activities such as hot work, confined space entry, and working at heights.
The permit outlines the work to be done, the hazards involved, and the ...
I applied via Approached by Company and was interviewed before Apr 2023. There were 2 interview rounds.
Daily work job and work
JSA (Job Safety Analysis) with hazard is a process of identifying potential hazards in a job task and implementing safety measures to mitigate risks.
JSA involves breaking down a job task into steps and identifying potential hazards at each step
Hazard analysis helps in determining the likelihood and severity of potential risks
Safety measures are then implemented to eliminate or reduce the identified hazards
Examples of h...
Risk is the potential for harm or loss resulting from exposure to hazards.
Risk is the likelihood of a negative event occurring.
It involves assessing the probability and severity of potential harm.
Examples include workplace accidents, natural disasters, and financial losses.
Risk management strategies aim to minimize or mitigate potential risks.
posted on 21 Jul 2024
posted on 14 Oct 2021
posted on 5 Oct 2023
posted on 16 Aug 2021
posted on 26 Jul 2023
I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.
posted on 4 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
String & central inverters are types of solar inverters used in solar power systems. Transformers are used to step up or step down voltage in electrical systems.
String inverters are used in smaller solar power systems and convert DC power from solar panels into AC power for use in the home.
Central inverters are used in larger solar power systems and are connected to multiple strings of solar panels to convert DC power ...
Hari Transformer unloading involves safely removing transformers from trucks and placing them in designated areas.
Ensure proper safety measures are in place before unloading transformers
Use appropriate equipment such as cranes or forklifts to lift and move the transformers
Follow manufacturer's guidelines for handling and placement of transformers
Inspect transformers for any damage during unloading process
Coordinate wit...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
196
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
118
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
117
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
107
salaries
| ₹0 L/yr - ₹0 L/yr |
Maintenance Engineer
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Vikram Solar
Adani Green Energy
Azure Power
Hero Future Energies