i
VTP Realty
Filter interviews by
Cumulative quantity statement of Towers is a report that shows the total number of towers built over a period of time.
The report should include the name of the tower, date of construction, and the total number of towers built.
It can be used to track progress and identify any delays or issues in tower construction.
The report can also be used to forecast future tower construction needs based on historical data.
Example: T...
I currently reside in XYZ city.
I live in a rented apartment in XYZ city.
My apartment is located near the city center.
I have been living in XYZ city for the past 5 years.
My commute to work takes around 30 minutes.
I am willing to relocate if required for the job.
I have 5 years of experience in billing engineering for construction projects.
Managed billing and invoicing for multiple projects simultaneously
Collaborated with project managers and clients to ensure accurate billing
Created and maintained project budgets and cost reports
Implemented process improvements to increase efficiency and accuracy
Experience with various billing software such as Procore and QuickBooks
Top trending discussions
I appeared for an interview in Sep 2024, where I was asked the following questions.
posted on 12 Nov 2024
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
I appeared for an interview in Feb 2025.
A fire pump room single line diagram illustrates the components and flow of water in fire protection systems.
Includes main components: fire pump, controller, water supply, and discharge piping.
Fire pump types: centrifugal, positive displacement, each suited for different applications.
Controller manages pump operation, ensuring automatic activation during fire alarms.
Water supply sources: municipal water, tanks, or rese...
Plumbing and fire fighting NBC code Standard etc.
I am excited to join your organization for its innovative projects, collaborative culture, and commitment to professional growth.
Innovative Projects: Your organization is known for cutting-edge technology, such as the recent AI-driven solutions that enhance user experience.
Collaborative Culture: I appreciate the emphasis on teamwork, as seen in your recent cross-departmental project that improved product delivery times...
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Cost review techniques are used to evaluate and analyze project costs.
Cost-benefit analysis
Earned value management
Variance analysis
Life cycle costing
Activity-based costing
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 5 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
I applied via Campus Placement and was interviewed before Nov 2022. There were 4 interview rounds.
Excel sheet filling round
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
75
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Senior Engineer
63
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Sales Manager
49
salaries
| ₹4.8 L/yr - ₹12.2 L/yr |
CRM Executive
39
salaries
| ₹2.1 L/yr - ₹5.4 L/yr |
Senior Sales Executive
36
salaries
| ₹3.7 L/yr - ₹6 L/yr |
Knight Frank
M3M India
R.S. Infraprojects
Emaar India Limited