i
Voltech
Filter interviews by
I applied via Recruitment Consultant and was interviewed in Jun 2021. There was 1 interview round.
GIS stands for Geographic Information System. ICT Protection refers to the protection of information and communication technology systems. REF stands for Relay Electronic Fundamentals.
GIS is a system that captures, stores, analyzes, and presents geographic data.
ICT Protection involves measures to safeguard information and communication technology systems from unauthorized access, damage, or disruption.
REF is a branch o...
Various types of protections are used in Powergrid substation to ensure safety and reliability of the system.
Overcurrent protection
Under/overvoltage protection
Differential protection
Distance protection
Frequency protection
Ground fault protection
Backup protection
Isolation protection
Lightning protection
GIS and AIS are two types of switchgear used in power systems.
GIS stands for Gas Insulated Switchgear and uses SF6 gas as insulation.
AIS stands for Air Insulated Switchgear and uses air as insulation.
GIS is more compact and requires less maintenance than AIS.
AIS is less expensive than GIS.
GIS is used in high voltage applications while AIS is used in low to medium voltage applications.
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Sep 2024. There were 3 interview rounds.
First round is aptitude test.the test questions topics for numerical solutions, logical reasoning, psychometric etc.
My name means 'peaceful ruler' in Latin.
My name is derived from the Latin word 'Pax' which means peace.
It also has roots in the Roman goddess of peace, Pax.
The name signifies a peaceful and authoritative presence.
The number of C&I instruments in work varies depending on the project requirements and scope.
The number of C&I instruments can range from a few dozen to several hundred in a typical industrial project.
These instruments include sensors, transmitters, controllers, recorders, and final control elements.
Examples of C&I instruments include pressure transmitters, temperature sensors, flow meters, level switches, and control
RTD measures temperature using the resistance change of a metal, while thermocouples measure temperature using the voltage generated at the junction of two different metals.
RTD stands for Resistance Temperature Detector, while thermocouple is a temperature sensor made of two different metals.
RTDs are more accurate and stable compared to thermocouples.
RTDs have a linear relationship between resistance and temperature, w...
Voltech interview questions for popular designations
I have extensive experience in management and technical development, focusing on team leadership and process optimization.
Led a team of 10 in a software development project, improving delivery time by 30%.
Implemented Agile methodologies, resulting in a 25% increase in team productivity.
Conducted training sessions on new technologies, enhancing team skills and knowledge.
Managed cross-functional teams to streamline opera
Get interview-ready with Top Voltech Interview Questions
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two coils of wire, known as primary and secondary coils
Works on the principle of electromagnetic induction
Used to step up or step down voltage levels in electrical circuits
Commonly used in power distribution systems
Transformer protection refers to the measures taken to prevent damage to transformers from faults or abnormal operating conditions.
Transformer protection devices include overcurrent relays, differential relays, and Buchholz relays.
Overcurrent relays protect against overloads and short circuits.
Differential relays compare the current entering and leaving the transformer to detect internal faults.
Buchholz relays detect g...
SPD stands for Standard Operating Procedure. It is a documented guide outlining the steps and activities required to complete a specific task or process.
SPD helps ensure consistency and quality in work processes
It provides a clear outline of responsibilities and expectations
Examples include SOPs for laboratory experiments, manufacturing processes, and customer service protocols
I applied via LinkedIn and was interviewed in Jan 2023. There were 2 interview rounds.
Top trending discussions
The duration of Voltech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 27 interviews
Interview experience
based on 457 reviews
Rating in categories
Testing & Commissioning Engineer
188
salaries
| ₹1.1 L/yr - ₹8.5 L/yr |
Electrical Testing Commissioning Engineer
115
salaries
| ₹1.5 L/yr - ₹7 L/yr |
Senior Testing Commissioning Engineer
79
salaries
| ₹2 L/yr - ₹9.1 L/yr |
Senior Engineer
65
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Senior Commissioning Engineer
54
salaries
| ₹2 L/yr - ₹10.5 L/yr |
Havells
Polycab Wires
CG Power and Industrial Solutions
C&S Electric