i
Voltech
Filter interviews by
The number of C&I instruments in work varies depending on the project requirements and scope.
The number of C&I instruments can range from a few dozen to several hundred in a typical industrial project.
These instruments include sensors, transmitters, controllers, recorders, and final control elements.
Examples of C&I instruments include pressure transmitters, temperature sensors, flow meters, level switches, and control
RTD measures temperature using the resistance change of a metal, while thermocouples measure temperature using the voltage generated at the junction of two different metals.
RTD stands for Resistance Temperature Detector, while thermocouple is a temperature sensor made of two different metals.
RTDs are more accurate and stable compared to thermocouples.
RTDs have a linear relationship between resistance and temperature, w...
Top trending discussions
I was interviewed in Jan 2025.
Costing and estimation assignment for Senior Engineer position
Understand the scope of the project and gather all relevant information
Break down the project into smaller tasks and estimate the time and cost for each task
Consider factors such as materials, labor, equipment, and overhead costs
Use historical data or industry benchmarks to validate your estimates
Provide a detailed cost breakdown and justification for your e
Computer software skills
Estimation & costing related work
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
posted on 25 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.
Basic Mechanical Engineering
C & C++ programming coding
posted on 13 Jan 2025
I applied via Newspaper Ad and was interviewed in Jun 2023. There were 2 interview rounds.
To reduce resistance in a transformer, one can use low resistance materials, increase the cross-sectional area of the winding, and minimize the length of the winding.
Use low resistance materials for the transformer windings
Increase the cross-sectional area of the winding to reduce resistance
Minimize the length of the winding to reduce resistance
Ensure proper insulation to avoid any short circuits
Maintain proper cooling
based on 1 interview
Interview experience
Testing & Commissioning Engineer
203
salaries
| ₹1.1 L/yr - ₹7.8 L/yr |
Electrical Testing Commissioning Engineer
109
salaries
| ₹1.5 L/yr - ₹7 L/yr |
Senior Testing Commissioning Engineer
79
salaries
| ₹2 L/yr - ₹9.1 L/yr |
Senior Engineer
67
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Senior Commissioning Engineer
54
salaries
| ₹2 L/yr - ₹10.5 L/yr |
BGR Energy Systems
Kirloskar Electric Company
Crompton Greaves Consumer Electricals
ABB