i
Voltech
Filter interviews by
I applied via LinkedIn and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
posted on 3 Apr 2021
I applied via Referral and was interviewed in Oct 2020. There were 5 interview rounds.
I applied via Job Portal and was interviewed before Sep 2020. There was 1 interview round.
Cable manufacturing involves several steps including wire drawing, stranding, insulation, and jacketing.
Wire drawing involves pulling metal through a die to reduce its diameter.
Stranding involves twisting multiple wires together to form a cable.
Insulation is added to protect the wires from damage and prevent electrical interference.
Jacketing is the final step where a protective outer layer is added to the cable.
Quality...
posted on 15 Jan 2024
Multiple choice questions
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Testing & Commissioning Engineer
189
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Testing Commissioning Engineer
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Testing Commissioning Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Commissioning Engineer
54
salaries
| ₹0 L/yr - ₹0 L/yr |
BGR Energy Systems
Kirloskar Electric Company
Crompton Greaves Consumer Electricals
ABB