I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
MEP services include mechanical, electrical, and plumbing systems in a building.
Mechanical services: HVAC systems, ventilation, heating, and cooling
Electrical services: Lighting, power distribution, fire alarm systems
Plumbing services: Water supply, drainage, sewage systems
Integration of MEP systems for efficient building operation
Fault current can be calculated using Ohm's Law and the impedance of the system.
Calculate the total impedance of the system, including both the source impedance and the impedance of the fault location.
Use Ohm's Law (I = V/Z) to calculate the fault current, where I is the fault current, V is the voltage, and Z is the total impedance.
Consider the type of fault (e.g. three-phase, single-phase) when calculating fault curre...
VRF and VRV systems are advanced HVAC systems that provide individual control over the temperature in different zones of a building.
VRF and VRV systems use refrigerant to transfer heat between the outdoor unit and multiple indoor units.
They are energy-efficient as they can vary the flow of refrigerant based on the heating or cooling requirements of each zone.
VRF systems are typically used for larger buildings with mult...
Different types of pumps used in fire fighting systems include centrifugal pumps, positive displacement pumps, and vertical turbine pumps.
Centrifugal pumps are commonly used in fire fighting systems due to their high flow rates and efficiency.
Positive displacement pumps are used for high pressure applications where a constant flow is required.
Vertical turbine pumps are used in situations where space is limited and a ve...
Top trending discussions
posted on 23 Jul 2024
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
posted on 26 Apr 2023
posted on 21 Mar 2023
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
Quantity of PQC can be calculated by multiplying area with thickness
PQC stands for Pavement Quality Concrete
Area is calculated by measuring length and width of the pavement
Thickness is usually 150 mm for highways
Quantity = Area x Thickness
Quantity of DBM can be calculated by using the formula: Volume of DBM = Area x Thickness
Calculate the area of the road surface to be covered with DBM
Determine the required thickness of the DBM layer
Multiply the area by the thickness to get the volume of DBM required
Consider the wastage factor while calculating the quantity of DBM
Use appropriate units of measurement for accuracy
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
Some of the top questions asked at the VK Building Services Site Engineer interview for experienced candidates -
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Project Engineer
35
salaries
| ₹2 L/yr - ₹5 L/yr |
Project Manager
24
salaries
| ₹4.8 L/yr - ₹8.4 L/yr |
Senior Engineer
11
salaries
| ₹4.6 L/yr - ₹7 L/yr |
Project Engineer Hvac
11
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Assistant Engineer
9
salaries
| ₹2 L/yr - ₹2.8 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group