Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by VK Building Services Team. If you also belong to the team, you can get access from here

VK Building Services Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 119 Reviews

Filter interviews by

VK Building Services Senior Project Manager Interview Questions and Answers

Updated 26 Aug 2024

1 interview found

Sort by: Popular

Senior Project Manager Interview Questions

user image Gorakh Raut

posted on 26 Aug 2024

Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
Selected  Selected

I applied via Company Website

1 Interview Round

1

Group Discussion Round

Whatever issue on site i got support from Ho. so that work productivity will increase..

Interview Preparation Tips

Interview preparation tips for other job seekers - With out technical unable to visualize our capability.

Interview questions from similar companies

Interview experience
5
 Excellent
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Referral and was interviewed before Dec 2023.

2 Interview Rounds

1

Group Discussion Round

The benefits of a healthy work-life culture contribute significantly to project growth.

2

One-on-one Round (2 Questions)

  • Q1. What strategies would you implement to ensure the company's growth rate continues to escalate?
  • Q2. What is the importance of safety and quality in the workplace?

Interview Preparation Tips

Interview preparation tips for other job seekers - Engage in positive actions to receive positive outcomes through proper preparation.

I was interviewed in Aug 2022.

1 Interview Round

1

Technical Round (14 Questions)

  • Q1. Two types of road 1:- Flexible pavements 2:- Rigid pavement Surveying, NGL, Enchrochment, OGL
  • Q2. FLEXIBLE PAVEMENT 1:- Embankment:- taking thickness 3m compacted .approximate,as per site conditions. Large size of soil particles 75mm lumps and cloud. Liquid ...read more
  • Q3. 2:- Subgrade:- Total thickness 500mm compacted two layer 250mm &250mm vibration roller. Large size of soil particles 50mm lumps and cloud, Effective CBR as per ...read more
  • Q4. Emulsion :- 1 :- prime coat :- low viscous cut back bitumen on wmm surfaces area and filling Up pores, voids . 2:- Tack coat:- Light application bitumen, asphal...read more
  • Q5. DBM:- it total thickness 150mm two layer compacted 75mm&75 mm, aggregate size 20mm to. 28mm,VG30 Grade bitumen .
  • Q6. Emulsion:- Tackcoat :- Light application of. Bitumen, asphalt, emulsion, and dilute water on the Surfaces area of DBM.
  • Q7. BC :- Total thickness 40mm/ 50mm compacted. It is mixture of aggregate chips 13.1mm. and bitumen VG30 grade. Seal coat :- Total thicknesses of 6 to 8mm Mix with...read more
  • Q8. Bituminous laying temperature 130 degree celceious to 150 degree celceious. Bituminous rolling temperature 80 degree celceious to 100 degree celceious.
  • Q9. RIGID PAVEMENT:-All process is a same above embankment to GSB. DLC:-150MM THICKNESSES TOLERANCE +/_6MM COMACTED PQC PAVEMENT:- 300MM THICKNESSES TOLERANCE +/-6M...read more
  • Q10. DLC:- Material suitability 1:- Aggregate size is 26.5 mm 2:-water absorption 2% max 3:- Soundness test:- ..Naso4= 12% Mgso4=18% 4:- Angle of abrasion <35% Max...read more
  • Q11. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1 2:- The minimum cement content 150 kg/ cum. If the fly ash more than 20% the minimum...read more
  • Q12. PQC :- Total thicknesses 300mm compacted tolerance +_6mm Material sutabilitey:- 1:- Aggregate size 31.5mm Water absorption to GSB DlC is same for PQC.
  • Q13. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash is more than 2o% The minimum cement content 310 kg percum. 2:-The flexuar strengt...read more
  • Q14. National highyway =2 to 4 lane Expressway. =6 to lane Construction coast of National 8 to 10 core /km Expressway construction coast= 14 core to 16core/ km

Interview Preparation Tips

Interview preparation tips for other job seekers - Expressway many smart and intlegent featue
HTMS - High traffic management system
VIDS:- Visual icedent deduction system
Many facilities in Expressway
1:- Excess rap
2;- line divider
3:-Grade seperation
4 Elevated section
Expressway is not multiple lane. It connected national highway
Interview experience
5
 Excellent
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Referral and was interviewed before Dec 2023.

2 Interview Rounds

1

Group Discussion Round

The benefits of a healthy work-life culture contribute significantly to project growth.

2

One-on-one Round (2 Questions)

  • Q1. What strategies would you implement to ensure the company's growth rate continues to escalate?
  • Q2. What is the importance of safety and quality in the workplace?

Interview Preparation Tips

Interview preparation tips for other job seekers - Engage in positive actions to receive positive outcomes through proper preparation.
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

1 Interview Round

1

One-on-one Round (1 Question)

  • Q1. Many questions on project and leadership

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush your skills, practice and always be honest.. confidence is extremely important and with only truth you can be super confident. Hiding truth may also get job but for job satisfaction only truth will help and Honest unbiased reviewer will definitely find you. Have patience and All the best!

I was interviewed in Aug 2022.

1 Interview Round

1

Technical Round (14 Questions)

  • Q1. Two types of road 1:- Flexible pavements 2:- Rigid pavement Surveying, NGL, Enchrochment, OGL
  • Q2. FLEXIBLE PAVEMENT 1:- Embankment:- taking thickness 3m compacted .approximate,as per site conditions. Large size of soil particles 75mm lumps and cloud. Liquid ...read more
  • Q3. 2:- Subgrade:- Total thickness 500mm compacted two layer 250mm &250mm vibration roller. Large size of soil particles 50mm lumps and cloud, Effective CBR as per ...read more
  • Q4. Emulsion :- 1 :- prime coat :- low viscous cut back bitumen on wmm surfaces area and filling Up pores, voids . 2:- Tack coat:- Light application bitumen, asphal...read more
  • Q5. DBM:- it total thickness 150mm two layer compacted 75mm&75 mm, aggregate size 20mm to. 28mm,VG30 Grade bitumen .
  • Q6. Emulsion:- Tackcoat :- Light application of. Bitumen, asphalt, emulsion, and dilute water on the Surfaces area of DBM.
  • Q7. BC :- Total thickness 40mm/ 50mm compacted. It is mixture of aggregate chips 13.1mm. and bitumen VG30 grade. Seal coat :- Total thicknesses of 6 to 8mm Mix with...read more
  • Q8. Bituminous laying temperature 130 degree celceious to 150 degree celceious. Bituminous rolling temperature 80 degree celceious to 100 degree celceious.
  • Q9. RIGID PAVEMENT:-All process is a same above embankment to GSB. DLC:-150MM THICKNESSES TOLERANCE +/_6MM COMACTED PQC PAVEMENT:- 300MM THICKNESSES TOLERANCE +/-6M...read more
  • Q10. DLC:- Material suitability 1:- Aggregate size is 26.5 mm 2:-water absorption 2% max 3:- Soundness test:- ..Naso4= 12% Mgso4=18% 4:- Angle of abrasion <35% Max...read more
  • Q11. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1 2:- The minimum cement content 150 kg/ cum. If the fly ash more than 20% the minimum...read more
  • Q12. PQC :- Total thicknesses 300mm compacted tolerance +_6mm Material sutabilitey:- 1:- Aggregate size 31.5mm Water absorption to GSB DlC is same for PQC.
  • Q13. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash is more than 2o% The minimum cement content 310 kg percum. 2:-The flexuar strengt...read more
  • Q14. National highyway =2 to 4 lane Expressway. =6 to lane Construction coast of National 8 to 10 core /km Expressway construction coast= 14 core to 16core/ km

Interview Preparation Tips

Interview preparation tips for other job seekers - Expressway many smart and intlegent featue
HTMS - High traffic management system
VIDS:- Visual icedent deduction system
Many facilities in Expressway
1:- Excess rap
2;- line divider
3:-Grade seperation
4 Elevated section
Expressway is not multiple lane. It connected national highway

VK Building Services Interview FAQs

How many rounds are there in VK Building Services Senior Project Manager interview?
VK Building Services interview process usually has 1 rounds. The most common rounds in the VK Building Services interview process are Group Discussion.

Tell us how to improve this page.

People are getting interviews through

based on 1 VK Building Services interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
VK Building Services Senior Project Manager Salary
based on 4 salaries
₹8.4 L/yr - ₹18.6 L/yr
46% less than the average Senior Project Manager Salary in India
View more details

VK Building Services Senior Project Manager Reviews and Ratings

based on 4 reviews

4.9/5

Rating in categories

4.5

Skill development

4.5

Work-Life balance

4.8

Salary & Benefits

3.9

Job Security

4.5

Company culture

4.5

Promotions/Appraisal

4.5

Work Satisfaction

Explore 4 Reviews and Ratings
Project Engineer
36 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Project Manager
24 salaries
unlock blur

₹4 L/yr - ₹9.5 L/yr

Senior Engineer
12 salaries
unlock blur

₹4.6 L/yr - ₹7 L/yr

Project Engineer Hvac
11 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

MEP Engineer
10 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Explore more salaries
Compare VK Building Services with

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview