I applied via Campus Placement and was interviewed in Sep 2023. There were 4 interview rounds.
Some Easy arithmetic questions with basic technical question of core ECE.
We are 10 people in GD. The topic given was Work life balance is a myth. we have given 5 minutes of time for preparing for it.
A multivibrator is an electronic circuit that generates square wave signals. An astable multivibrator has two unstable states.
Multivibrator is a type of electronic circuit used to generate square wave signals
Astable multivibrator has two unstable states: high and low
It continuously switches between these two states without external triggering
Common examples of multivibrators include astable, monostable, and bistable mu
Top trending discussions
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
There were three python based interview questions
There were three Aptitude based interview questions
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
10 questions descriptive
English grammar, sentence correction
I applied via Job Fair and was interviewed in Feb 2023. There were 3 interview rounds.
Retail operations on if to put a apple store in best buy. Need to deicide if feasible or not. That is really the extent, and you must formulate something very thoughtful. I don't know what else you would really like to know, it was super duper insane. I really went so hard at grinding on the interviewer she practically pulled her pants down and ate me out. It was a brutal one until I got to smash, which was great. Then we went back to my place and did the deed about 100 more times precisely. It was one of the wildest experiences I will ever have in my life. detail oriented, one on one interview.
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
Lean production system is a manufacturing philosophy that focuses on minimizing waste and maximizing efficiency.
It involves continuous improvement and elimination of non-value-added activities
It emphasizes on creating a pull-based system where production is based on customer demand
It involves the use of tools such as Kanban, 5S, and Kaizen
Examples of companies that use lean production system include Toyota, Nike, and I
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability is calculated by dividing the total operating time by planned production time.
Performance is calculated by dividing the actual production rate by the maximum production rate.
Quality is calculated by dividing the number of good units produced by the total number of units produced.
OEE = Availability x Performance x Quality
I applied via Campus Placement and was interviewed in Jul 2023. There were 3 interview rounds.
Basic mathematics and coding MCQ questions
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
based on 1 interview
Interview experience
Assistant Engineer
475
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Executive
445
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
438
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Manager
324
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
250
salaries
| ₹0 L/yr - ₹0 L/yr |
Xiaomi
Samsung
OPPO
Realme