Filter interviews by
The amount of bricks used in 1 sqft varies depending on the size of the bricks.
The size of the bricks determines the number of bricks needed per square foot.
Standard brick sizes are 3 5/8 inches by 2 1/4 inches by 8 inches.
For standard bricks, approximately 7 bricks are needed per square foot.
Different brick sizes or patterns may require different quantities.
The ratio of concrete for a slab depends on the type of slab and its intended use.
The most common ratio for a concrete slab is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts coarse aggregate.
For heavy-duty slabs, a higher strength concrete mix with a ratio of 1:1.5:3 may be used.
For thinner slabs or non-structural purposes, a leaner mix with a ratio of 1:3:6 can be used.
The water-cement ratio should be car...
The density of cement is a measure of its mass per unit volume.
Density of cement is typically around 1440 kg/m³.
It can vary depending on the type and composition of the cement.
Density is an important property for construction materials as it affects the strength and durability of concrete.
Higher density cement is generally preferred for structural applications.
Density can be determined through laboratory tests or obtai...
Top trending discussions
Normal . Keep calm stay focused. Study hard work smart.
Great
I appeared for an interview before Jan 2024.
posted on 12 Dec 2024
The question is related to structural engineering concepts like code, footing design, and load combination.
Code refers to the set of rules and regulations that govern the design and construction of structures.
Footing design involves determining the size and depth of footings to support the structure above.
Load combination is the process of combining different types of loads (e.g. dead load, live load, wind load) to ass...
STLC (Software Testing Life Cycle) outlines the phases of software testing from planning to closure.
1. Requirement Analysis: Understand testing requirements based on specifications.
2. Test Planning: Define the scope, resources, and schedule for testing activities.
3. Test Case Design: Create detailed test cases and scenarios to validate functionality.
4. Test Environment Setup: Prepare the environment where testing will ...
Waits in Selenium manage timing issues during automated testing, ensuring elements are ready for interaction.
Implicit Wait: Sets a default wait time for the entire session. Example: driver.manage().timeouts().implicitlyWait(10, TimeUnit.SECONDS);
Explicit Wait: Waits for a specific condition to occur before proceeding. Example: WebDriverWait wait = new WebDriverWait(driver, 10); wait.until(ExpectedConditions.visibilityO...
I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality audits and inspections
Skilled in root cause analysis and implementing corrective actions
Proficient in using quality tools such as FMEA, Control Charts, and Pareto Analysis
I handle conflict by actively listening, seeking common ground, and finding solutions collaboratively.
I approach conflicts with a calm and rational mindset
I actively listen to all parties involved to understand their perspectives
I seek common ground and areas of agreement to build a foundation for resolution
I work collaboratively with others to find mutually beneficial solutions
I am open to feedback and willing to comp...
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
1. Check sheets: Used to collect and analyze data in a systematic way.
2. Pareto chart: Helps identify the most significant factors contributing to a problem.
3. Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
4. Histogram: Represents data distribution...
The least count of a micrometer is the smallest measurement that can be read on the scale of the micrometer.
The least count of a micrometer is typically 0.01 mm or 0.001 mm depending on the type of micrometer.
It is determined by the number of divisions on the thimble and the pitch of the screw.
For example, a micrometer with 50 divisions on the thimble and a pitch of 0.5 mm would have a least count of 0.01 mm.
It was a good easy level test and prior preparation is importanat
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
based on 1 review
Rating in categories
Civil Site Engineer
9
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Store Incharge
7
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Assistant Manager
4
salaries
| ₹5.4 L/yr - ₹9.7 L/yr |
Senior Engineer
4
salaries
| ₹6.2 L/yr - ₹7.2 L/yr |
Coca-Cola Company
Dhoot Transmission
Genius Consultants
Apotex Research